My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2006_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:23 PM
Creation date
7/3/2020 10:43:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_1
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2006_1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Sec. 10-1, Construction Details <br /> Std. Spec.Sec 80 <br /> Special <br /> Page 2 of 3 <br /> C. Post caps shall be schedule 40 galvanized metal post caps. <br /> D. Gates shall swing as directed by the Engineer. All walk gates shall open and close <br /> freely without any obstruction. <br /> 2.03 T-POST FENCE <br /> A. Wood Corner Post shall be 4 x 4 pressure treated fence post. Barbed wire shall be <br /> ' nailed to the wood corner post with galvanized fence staples. <br /> B. T-Posts shall be #133 studded posts with spade either painted with green or red rust <br /> inhabitant paint. <br /> C. Barbed wire shall be per Standard Specifications Section 80-3.01C. <br /> PART 3 - EXECUTION <br /> ' 3.01 INSTALLATION <br /> A. Location of each fencing item will be staked on site by the County. <br /> B. Existing fences shall be connected to the new walk and drive gates. <br /> C. All gate posts shall be installed plumb. <br /> ' D. Dispose old barbed wire and wood post at the site. Contractor shall pay <br /> all site disposal fees. <br /> E. Stack all old fence T-Posts on site as directed by the Engineer. <br /> ' F. Removal and re-construction of barbed wire fence for drill rig access shall be of the sole <br /> cost of the Contractor. <br /> G. Any fencing work not installed to the satisfaction of the Engineer will be required to be <br /> re-installed at no additional cost to the County. <br />
The URL can be used to link to this page
Your browser does not support the video tag.