calculated permeation through the prescriptive cover identified in Title 27 then that area will be <br />accepted as closed. Until that time, this area is maintained as an operational activity. <br />6.11.8.2. PRELIMINARY CLOSURE COSTSPreliminary Closure Costs <br />The County's preliminary closure cost estimate is $26.7 Million dollars (Appendix 4EB)The <br />:. Cost are based on "third party" construction. <br />- - <br />- <br />- - - - <br />_ <br />Foothill Sanitary Landfill ..___ _Page 98 ____, Public Works/Solid Waste <br />Joint Technical Document„_.___ �_� County of San Joaquin — Revised 7/30/10 <br />