My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2010_3
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2010_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 9:45:38 PM
Creation date
7/3/2020 10:44:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2010_3
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2010_3.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 FACILITIES DESIGN AND CONSTRUCTION STANDARDS <br />5.1. Design Standards <br />Designs prior to 1997 met Title 14 Regulations. Module 1 (designed in 2001-02) met <br />CCR Title 27 and Subtitle D regulations. Future Modules will meet the requirements applicable <br />at the time of design. <br />San Joaquin County is responsible for the design of the facility. The County submits <br />engineering designs and-plafs-for each module to the regulatory agencies for their review and <br />approval prior to construction. The design of each cell complies with CCR Title 27 and Subtitle <br />D construction and design standards. Detailed nrened ,res far nenGtF Gtien are presented in the <br />Likewise,, detailed <br />deSUiption of the quality control and quality assurance procedures (that will be employed d <br />final GOveF GMMFurtien is pFevided On the CQA plan is -included with the cell design. <br />Designs are prepared by engineers licensed in the State of California. <br />• The original facility design was prepared by San Joaquin County staff and under the <br />supervision of Gabriel R. Karam. PE (RCE C33172). <br />• Module 1 was designed by Mr. Frederick W. Cope. PE (RCE C19691) of Shaw <br />Environment and Infrastructure. <br />• Extension of Module 1 liner onto a portion of Module "I" refuse was designed by <br />Timothy Crandall (RCE NLS C045599). <br />Future designs will be by engineers licensed in the State of California. <br />Foothill Sanitary Landfill Page 43 Public Works/Solid Waste <br />Joint Technical Document County of San Joaquin — Revised 7/30/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.