Laserfiche WebLink
In some cases, regulatory agency staff has directed the County to implement specific design <br />features, such as the gas -impermeable barrier between older Module "I" refuse and newer <br />refuse that can be placed over Module "I" footprint due to the construction of Module 1. -In <br />5.3. General Design Parameters <br />5.3.1 Previous Designs <br />Module "I" is an <br />Uunlined approximately 80 -acres, located in the center portion of the existing Foothill <br />siteLandfill property. Wastes were placed from 1965 through 2003. <br />5.3.2 Future Ddesign <br />5.3.2.1 General <br />Foothill Sanitary Landfill Page 44 Public Works/Solid Waste <br />Joint Technical Document County of San Joaguin — Revised 7/30/10 <br />