Laserfiche WebLink
• <br />Recognition of the installation of the first phase landfill gas (LFG) collection and <br />control system <br />Recognition of the completion of the perimeter LFG migration monitoring system (i.e. <br />no longer a component of landfill closure). <br />Foothill Sanitary landfill <br />Preliminary CPCM Plan <br />B-2 Public Works/Solid Waste <br />County of San Joaquin — Rev July 2010 <br />