Table 1 <br />Preliminary Closure Cost Estimate <br />Foothill Sanitary Landfill <br />San Joaquin County, California <br />Items <br />Quantity <br />Units <br />Unit Cost <br />Extn <br />FINAL COVER SOIL <br />1 Preparation of landfill to receive cover (final grading) <br />673 <br />AC <br />$3,700 <br />$2,490,100 <br />2 Evapotranspiration Layer (on-site soils) <br />3,800,200 <br />CY <br />$4.00 <br />$15,200,800 <br />3 Vegetation (mulch and hydroseeding) <br />700 <br />AC <br />$3,000 <br />$2,100,000 <br />Final Cover Soil Subtotal <br />$19,790,900 <br />MONITORING SYSTEM <br />4 Perimeter Landfill Gas Monitoring System <br />4 <br />EACH <br />$17,000 <br />$68,000 <br />5 Groundwater Monitoring System <br />2 <br />EACH <br />$10,500 <br />$21,000 <br />6 Leachate Control System <br />10 <br />EACH <br />$2,500 <br />$25,000 <br />Monitoring Systems Subtotal <br />$114,000 <br />LFG CONTROL <br />7 Disabling and Rebuilding Gas System <br />1 <br />LS <br />$325,000 <br />$325,000 <br />8 System expansion at Closure <br />10 <br />AC <br />$8,000 <br />$80,000 <br />LFG Control 5 stem Subtotal <br />$405,000 <br />SITE IMPROVEMENTS <br />9 Drainage Structures <br />32,000 <br />LF <br />$6.00 <br />$192,000 <br />10 Security Measures <br />5,000 <br />LF <br />$35 <br />$175,000 <br />11 Survey Monuments <br />4 <br />EACH <br />$6,000 <br />$24,000 <br />12 Dismantle Structures <br />5,500 <br />SF <br />$5.00 <br />$27,500 <br />13 Decommission Environmental Monitoring System <br />None planned for <br />closure <br />$0 <br />Other Site Improvement Subtotal <br />$418,500 <br />Total Construction Cost <br />$20,728,400 <br />PROFESSIONAL SERVICES <br />14 Engineering (Design and Bid Documents) <br />2% <br />of total construction <br />cost <br />$414,600 <br />15 Topographic and Boundary Survey <br />1 <br />LS <br />$77,000 <br />$77,000 <br />16 Construction Quality Assurance <br />5% <br />Final Cover <br />$989,500 <br />Professional Services Subtotal <br />$1,481,100 <br />TOTAL ESTIMATED CLOSURE COST <br />$22,209,500 <br />CONTINGENCY (20%) <br />$4,441,900 <br />TOTAL <br />$26,651,400 <br />AC = acre <br />SF = square foot <br />CY = cubic yard <br />LS = lump sum <br />All Costs are in 2010 dollars. <br />FINAL COVER - Assume ET cover over existing vegetated 18 inch thick (minimum) intermediate cover; See Note 1 <br />below. <br />ET cover thickness over existing cover (FT) 3.5 <br />Volume of ET cover placed (CY), over 673 AC 3,800,200 <br />1. Unit cost for preparation of landfill to receive final cover includes disking vegetation, sequentially stripping 6 inches of <br />the organic rich intermediate soil cover, and subsequently incorporating 3 inches of this material into the first two 1.0 -foot - <br />thick layers of the ET soil cover. (For two net 1.25 -foot -thick ET soil layers over the 1.0 foot existing intermediate soil <br />cover). This unit cost includes: <br />1 Disking @ $500/AC <br />1 Stripping @ $1,614/AC 807 CY/AC @ $2.00/CY for excavation (See UCB Table for excavation) <br />2 Placements @ 2 x $807/AC 404 CY/AC @ $2.00 CY for eartfill as placed with each 1 foot <br />of ET soil cover (See UCB Table for earthfill) <br />TOTAL $3,728/AC <br />Call $3,700/AC <br />2. Unit cost to excavate, transport, and place ET soil cover, in two 1.0 foot lifts (1.25 foot net lifts when blended <br />with the <br />organic soils), and a final 1.5 foot lift before mulching is $4.00/CY; See UCB Table. <br />3. Vegetation (mulch and hydroseeding of the upper 6 inches of the ET soil cover) is estimated at $3,000 per acre; See <br />UCB Table. <br />09San Joaquin CounlyM6605 FooWhClosure PC CosIslFH Clo-PoslClo Rev 07262010.xis. Table 2-3 Clo <br />Foothill Sanitary Landfill <br />Preliminary PCPM Plan Page 1 of 4 <br />Public Works/Solid Waste <br />County of San Joaquin - Revised July 28, 2010 <br />