Laserfiche WebLink
Table 1 (continued) <br />Preliminary Closure Cost Estimate <br />Foothill Sanitary Landfill <br />San Joaquin County, California <br />MONITORING SYSTEM <br />4. Twenty LFG perimeter monitoring wells were installed in 2009 at a cost of $414,000. Each well consists of 3 probes. <br />Assume four perimeter wells will be replaced at an estimated cost of $17,000 each; or the existing LFG wells will undergo <br />repairs. <br />5. A total of six perimeter groundwater monitoring wells will be installed as additonal lined modules are developed prior <br />to closure. Assume either two new groundwater wells will be installed at closure, at a cost of $75/foot for 140 foot depths <br />= $10,500 each; or the existing wells will undergo repairs. <br />6. It is anticipated that the leachate system and underlying pan lysimeter will be installed as each module is constructed. <br />Each Ieaehate removal system will be inspected and repaired at an estimated cost of $2,500 each. <br />LFG CONTROL - a portion of the above -ground LFG system will be replaced during closure <br />7. Disabling and rebuilding of LFG field components, as assessed on page 3 = $325,000. <br />8. System expansion, cost per acre = $4,679,275 / 673 acres x 1.147 DRRR inflation rate, per page 3 = $7,975/AC; Call <br />$8,000/AC. <br />SITE IMPROVEMENTS <br />9. Drainage structures will include perimeter ditching and graded drainage swales on the landfill surface. The top and <br />sideslope swales total 11,000 LF, and the perimeter ditches along the toe of the landfill total 21,000 LF. It is assumed the <br />12 -foot -wide ditches and detention basins within the 200 -foot -wide setback area are constructed as an element of each <br />adjacent module. Cost per LF of the ditches and swales, per UCB, is $6 per LF. <br />10. Fencing will be placed around the entire site as it is developed. Fencing at closure assumes approximately 2,500 <br />feet of aluminized steel fence, 8 feet high, at $35/LF. <br />11. Assume four survey monuments will be installed at closure at $6,000 each. <br />12. Structures to be removed include the scalehouse, office and maintenance buildings, with surface area of <br />approximately 5,500 SF. Demolition cost, assumes buildings on 4" concrete slab at $5.00 per SF. <br />13. Any dismantling of environmental control system will be included in the post -closure costs. <br />PROFESSIONAL SERVICES <br />14. FC&PCP and construction documents are estimated at 2% of the total construction cost. <br />15. Assume conventional topographical survey + aerial surveying. Cost based on maximum topographic survey cost per <br />R S Means, 2004 = $67,000; 2010 cost = $67,000 x 1.147 = $76,800; Call $77,000. <br />16. COA at 5% of final cover construction. <br />CIASan Joaquin Counlyl136605 FoothilhClosure PC CostMFH Clo-PoslClo Rev 07262010.x15. Table 2-3 Clo <br />Foothill Sanitary Landfill <br />Preliminary PCPM Plan Page 2 of 4 <br />Public Works/Solid Waste <br />County of San Joaquin - Revised July 28. 2010 <br />