My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 11:42:29 AM
Creation date
7/3/2020 10:45:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2014.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.10 CENTRALIZERS <br /> Centralizers shall be composed of plastic or stainless steel. Galvanized steel or <br /> black iron shall not be used. <br /> 1 2.11 WELL PUMP <br /> Well pump shall be Groundfos Rediflo 2, single phase, 230 Volts, stainless steel <br /> submersible pump. <br /> A. Discharge Tubing <br /> Pump discharge tubing shall be polyethylene (PE) or equivalent. Tubing <br /> connections to the pump and to the well cap shall be made with stainless steel <br /> compression fittings. The tubing shall have a stainless steel check valve installed <br /> and at the bottom. <br /> B. Motor Lead <br /> Motor lead wire shall be of appropriate gauge. The length shall be based to the <br /> depth of each well. Lead wire shall be all-in-one, integrated with the safety cable <br /> and have electrical connectors for connection to the pump controller. <br /> C. Safety Cable Bracket <br /> Pump safety cable bracket and cable shall be stainless steel. <br /> D. Well Cap <br /> Well cap shall be of appropriate size to fit the well casing and shall have <br /> connections for the discharge tubing and the lead wire. <br /> PART 3 EXECUTION <br /> 3.01 GENERAL <br /> Groundwater well depths will have at least 15 feet of screen below the groundwater <br /> elevation at each site. The actual well depth will be determined in the field by the <br /> 1 Engineer based on the groundwater level. Contractor shall leave well bores open <br /> for a minimum of 12 hours to allow water level to stabilize before installing the <br /> well. <br /> On-Call Driller RFB 6820 San Joaquin County <br /> Groundwater Monitoring Well Specifications 4 Public Works Dept <br /> Solid Waste Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.