Laserfiche WebLink
7. Placing A.B. around the well skirt. <br /> 6.06 WELL DEVELOPMENT <br /> Well development includes doing all the work specified here-in, including <br /> providing the well development report to the Engineer. Well development will be <br /> on the lump sum cost per day as quoted in the bid proposal. <br /> 6.07 WELL PUMP <br /> Payment for each well pump shall be per lump sum cost quoted in the bid <br /> proposal. <br /> 6.08 DISCHARGE TUBING <br /> Payment for discharge tubing shall be by the unit price per linear foot quoted in <br /> the bid proposal. Payment shall include stainless steel tubing connections and <br /> check valve. <br /> 6.09 MOTOR LEAD <br /> Payment for motor lead shall be by the unit price per linear foot quoted in the bid <br /> proposal. <br /> 6.10 SAFETY CABLE BRACKET <br /> Payment for each safety cable bracket shall be per lump sum cost quoted in the <br /> bid proposal. <br /> 6.11 WELL CAP <br /> Payment for each well cap shall be per lump sum cost quoted in the bid proposal. <br /> 6.12 PUMP INSTALLATION <br /> Payment for each well pump installation shall be per lump sum cost quoted in the <br /> bid proposal. <br /> 6.13 BOLLARDS <br /> A. Measurement for payment for installing bollards shall be per the number of <br /> bollards installed per the contract figures. <br /> On-Call Driller RFB 6820 San Joaquin County <br /> 1 Groundwater Monitoring Well Specifications 13 Public Works Dept <br /> Solid Waste Division <br />