Laserfiche WebLink
A. Mobilization/ demobilization shall include all work according to mobilization <br /> anddemobilization specifications in the Scope of Work, and according to the <br /> specifications specified herein. Demobilization shall include submittal of required <br /> reports. <br /> B. Payment for mobil ization/demobilization will be based on the lump sum price <br /> quoted in the proposal. <br /> 6.03 GROUND WATER WELL <br /> A. Measurement of depth will be by weighted tape or other method acceptable to <br /> the Engineer. <br /> B. Payment shall be per unit price per linear foot as quoted in the bid proposal. <br /> Payment shall include drilling the well boring, and installing the well with EHD <br /> inspection as shown on the contract figures and as specified herein. <br /> 6.04 ABANDONED BORINGS <br /> A. Abandoned borings include drilling and filling abandoned borings. <br /> B. Measurement of depth will be by weighted tape or other method acceptable to <br /> the Engineer. <br /> C. Payment for abandoned borings shall be by the unit price per linear foot quoted in <br /> the bid. The unit price quoted shall include full compensation for final grade <br /> restoration. <br /> 6.05 WELL SURFACE COMPLETION <br /> A. Measurement shall be per the number installed. <br /> B. Payment for each surface completions shall be per lump sum cost quoted in the <br /> bid proposal. The lump sum cost shall include full compensation for furnishing all <br /> labor, materials, tools and equipment for: <br /> 1. Purchasing or fabricating the well enclosure <br /> 2. Painting the well enclosure <br /> 3. Installing the well enclosure with the concrete well shirt <br /> 4. Inscribing the date and well No. on the concrete well skirt <br /> 5. Labeling the well enclosure <br /> 6. Installing well plugs and filling sand inside the well enclosure <br /> On-Call Driller RFB 6820 San Joaquin County <br /> Groundwater Monitoring Well Specifications 12 Public Works Dept <br /> Solid Waste Division <br />