Laserfiche WebLink
DAILY FIELD REPORT Page 1 of <br />Project Name: Foothill Sanitary Landfill - Area 2A Report Number: 015 <br />Project Number: 11-101-01 Date: Monday 06/01/15 <br />Owner: Dept. of Public Works, San Joaquin County CQA Monitors: T. Sathees <br />Contractor: R J Gordon Construction, Inc. <br />Weather: Clear Wind: 0-10 mph. <br />Temperature: A22rox. range 60-85 F Other: <br />The contractor worked from 7:00 am to 5:30 pm. <br />Excavation: 7:00 am to 5:30 pm. Up to (1) CAT D6 and (1) CAT D8 dozers with ripper attachments assisted up to (4) CAT 627 <br />and (2) CAT 637 scrapers load material from the excavation along north and east sides of the cell. The soil was hauled and <br />stockpiled at South Stockpile 2 for use as Operations layer soil, and to Earthfill construction along south side of the cell and <br />east side (upper bench) of the Cell. The soil was hauled on an approximate 5 -min cycle. Scrapers went idle after 3:30 pm. <br />(1) CAT 14H motorgrader and the second CAT D6 dozer (with slope board attachment) part time trimmed the upper slopes <br />along north side of the cell. <br />North West Stockpile: No activity was observed. <br />South Stockpile 1 (Foundation): No activity was observed. <br />South Stockpile 2 (Operations): 7:00 am to 5:30 pm. The scrapers hauled the generally sandy materials from upper slopes <br />along north and east sides of the cell to the South Stockpile 2 for use as Operations layer soil. One composite sample was <br />obtained, and the fines content was 12.5 % of the portion finer that 3/8 -inch. (1) CAT 14H motorgrader was observed <br />spreading and grading the soil in the Stockpile fill areas, and maintaining haul roads. (1) CAT 621 water pull was used to <br />maintain fill areas, and haul roads. <br />Access Road Embankment Fill (Earthfill): No activity was observed. <br />Subgrade Earthfill along South side and East side (Upper Bench) of the Cell: 7:00 pm to 5:30 pm. (1) CAT 621 water pull <br />moisture -conditioned the Earthfill placed previous day. (1) CAT 825 compactor was used to break the big clods and to <br />compact the Earthfill. After 3:00 pm, two scrapers hauled few loads of material from the excavation areas and placed Earthfill <br />and the second CAT D6 dozer spread the Earthfill <br />Equipment Onsite: (1) CAT D8T dozer, (1) CAT D6T dozer, (1) CAT D6R dozer (with slope board) (1) CAT 621G water pull, <br />(4) CAT 627 scrapers, (3) CAT 637 scrapers, (1) 14H motorgrader, (1) CAT 825H compactor <br />Problems/Resolutions. <br />Visitors: M. Raub <br />Reviewed By: M. Raub <br />C <br />waw <br />