Laserfiche WebLink
DAILY FIELD REPORT Page 1 of 1 <br />Project Name: Foothill Sanitary Landfill - Area 2A Report Number: 011 <br />Project Number: 11-101-01 Date: Tuesday 05/26/15 <br />Owner: Dept. of Public Works, San Joaquin County CQA Monitors: T. Sathees <br />Contractor: R J Gordon Construction, Inc. <br />Weather: Clear Wind: 0-10 mph. <br />Tem erature: ARprox. range 55-80 F Other: <br />The contractor worked from 7:00 am to 5:30 pm. <br />Excavation: 7:00 am to 5:30 pm. Up to (2) CAT D6 and (1) CAT D8 dozers with ripper attachments assisted up to (4) CAT 627 <br />and (2) CAT 637 scrapers load material from the excavation along north side and east side (upper slopes) of the cell. The soil <br />was hauled and stockpiled at North West Stockpile for use as daily cover for active landfill operations, South Stockpile 2 for <br />use as Operations layer soil, and to Earthfill construction along south side of the Cell. The soil was hauled on an approximate <br />5 -min cycle. <br />(1) CAT 14H motorgrader and (1) CAT D6 dozer with slope board attachment trimmed the upper slopes along north side of <br />the cell. <br />North West Stockpile: 7:00 am to 5:30 pm. (. (1) CAT 14H motorgrader was observed spreading and grading the soil in the <br />stockpile fill area and maintaining haul roads. (1) CAT 621 water pull was used to maintain haul roads. <br />South Stockpile 1 (Foundation): No activity was observed. <br />South Stockpile 2 (Operations): 7:00 am to 5:30 pm. Up to (4) CAT 627 scrapers hauled the relatively sandy materials from <br />upper slopes along north side of the cell and stockpiled for use as Operations layer soil. Two composite samples were <br />obtained, and the fines content was 27 to 29 % of the portion finer that 3/8 -inch. <br />Access Road Embankment Fill (Earthfill): No activity was observed. <br />Liner Subgrade Earthfill along South side of the Cell: 7:00 pm to 2:30 pm. (1) CAT 621 water pull moisture -conditioned <br />the Earthfill. (1) CAT 825 compactor was used to break the big clods and to compact the Earthfill. (2) CAT 627 scrapers <br />hauled the material from the excavation areas and placed Earthfill. Density testing on the Earthfill indicated compliance with <br />the specifications. <br />Equipment Onsite: (1) CAT D8T dozer, (1) CAT D6T dozer, (1) CAT D6R dozer (with slope board) (1) CAT 621G water pull, <br />(4) CAT 627 scrapers, (3) CAT 637 scrapers, (1) 14H motorgrader, (1) CAT 825H compactor <br />Problems/Resolutions. <br />Visitors: <br />Reviewed By: M. Raub <br />Earth rmd "rncG <br />J <br />