C <br />DAILY FIELD REPORT Page 1 of 1 <br />Project Name: Foothill Sanitary Landfill - Area 2A Report Number: 010 <br />Project Number: 11-101-01 Date: Friday 05/22/15 <br />Owner: Dept. of Public Works, San Joaquin County CQA Monitors: T. Sathees <br />Contractor: R J Gordon Construction, Inc. <br />Weather: Partly cloudy Wind: 0-10 mph. <br />Temperature: A22rox. range 50-75 F Other: <br />The contractor worked from 7:00 am to 4:00 pm. <br />Excavation: 7:00 am to 4:00 pm. Up to (2) CAT D6 (one was delivered today with slope board attachment) and (1) CAT D8 <br />dozers with ripper attachments assisted up to (4) CAT 627 and (2) CAT 637 scrapers load material from the excavation along <br />north side of the cell. The soil was hauled and stockpiled at North West Stockpile for use as daily cover for active landfill <br />operations and at South Stockpile 2 for use as Operations layer soil. Some soil was hauled for liner subgrade Earthfill <br />construction along south side of the Cell. The soil was hauled on an approximate 5 -min cycle. <br />(1) CAT 14H motorgrader and (1) CAT D6 dozer with slope board attachment trimmed the upper slopes along north side of <br />the cell. <br />North West Stockpile: 7:00 am to 4:00 pm. (1) CAT 14H motorgrader was observed spreading and grading the soil in the <br />stockpile fill area and maintaining haul roads. (1) CAT 621 water pull was used to maintain haul roads. <br />South Stockpile 1 (Foundation): No activity was observed. <br />South Stockpile 2 (Operations): 7:00 am to 9:30 am. (2) CAT 627 scrapers hauled the sandy materials from upper slopes <br />along north side of the cell and stockpiled for use as Operations layer soil. One composite sample was obtained, and the fines <br />content was tested as 24 % of the portion finer that 3/8 -inch. The Contractor stopped stockpiling activity at mid-morning as <br />hard material was encountered with larger clods size. (1) CAT 14H motorgrader was observed spreading and grading the soil <br />in the stockpile fill area and maintaining haul roads. (1) CAT 621 water pull was used to maintain haul roads. <br />Access Road Embankment Fill (Earthfill): No activity was observed. <br />Liner Subgrade Earthfill along South side of the Cell: 7:00 pm to 4:00 pm. (1) CAT 621 water pull moisture -conditioned <br />the Earthfill. (1) CAT 825 compactor was used to break the big clods and to compact the Earthfill. (2) CAT 627 and (2) CAT <br />637 scrapers hauled the material from the excavation areas and placed Earthfill. As large soil clods appeared and the fill was <br />dry, the Contractor was advised by AES to apply more compaction effort along with more water application before placing <br />additional fill. The Contractor then diverted the CAT scrapers to North West stockpile. Density testing on the Earthfill <br />indicated compliance with the specifications. <br />Equipment Onsite: (1) CAT D8T dozer, (1) CAT D6T dozer, (1) CAT D6R dozer (with slope board) (1) CAT 621G water pull, <br />(5) CAT 627 scrapers, (3) CAT 637 scrapers, (1) 14H motorgrader, (1) CAT 825H compactor <br />Problems/Resolutions. <br />Visitors: <br />Reviewed By: M. Raub <br />