My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:49 PM
Creation date
7/3/2020 10:46:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2015
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAILY FIELD REPORT Page 1 of 1 <br />Project Name: Foothill Sanitary Landfill - Area 2A Report Number: 042 <br />Project Number: 14-101-01 Date: Wednesday 07/08/15 <br />Owner: Dept. of Public Works, San Joaquin County CQA Monitors: M. Hu and <br />Contractor: R J Gordon Construction, Inc. <br />Weather: Clear Wind: 0-10 mph. <br />Temperature: A rox. range 70- 85 F Other: <br />The contractor worked from 7:00 am to 4:30 pm. Excavation was shut down at 3:30 and slope preparation continued. <br />Excavation: (1) CAT D6 dozer and (2) CAT 627 scrapers continued excavating trim material from Drainage Basin 2 at <br />southeast corner of the project area, and hauled the material to the South Stockpile 3. Also (1) CAT D8 dozer graded Basin 1. <br />The material from Basin 1 was hauled to the adjacent County daily cover stockpile. Only (2) scrapers were used today, on <br />various activities. (1) CAT 621 water pull was used to maintain excavations, haul roads and stockpile and fill areas <br />Slope Subgrade Preparation: Up to (6) laborers using hand tools prepared the slope areas, and the side boom smooth drum <br />roller was used to roll the north slope. Some of the areas that were rolled complied with the specifications. <br />Access Road: Up to (1) CAT D6 dozer, (1) CAT 14 H motorgrader, (1) CAT 825 compactor, (2) CAT 627 scrapers, and (1) CAT <br />825 compactor began placement of subgrade fill fro the access road. Less than 1 foot of material was placed today. <br />Foundation Layer: No activity observed today. <br />Sump Construction: No activity observed today. <br />North West Stockpile: No activity was observed. <br />South Stockpile 1 (Foundation): No activity was observed. <br />South Stockpile 2 (Operations): No activity was observed. <br />South Stockpile 3: The scrapers hauled and stockpiled the trim soil from the excavation at the East slope. (1) CAT D8 dozer <br />graded the stockpile. <br />Geosynthetics: No activity. A planned activity for the test pad has been postponed. <br />Equipment Onsite: (1) CAT D8T dozer, (1) CAT D6T LGP dozer, (1) CAT D6R dozer (with slope board) (1) CAT 621G water <br />pull, (4) CAT 627 scrapers, (1) 14H motorgrader, (1) CAT 825H compactor, (1) water truck, (1) Hitachi 300 excavator, (1) <br />CAT CS 54B smooth drum roller (vibratory type), (1) CAT TH160B folk lift, (1) CAT side -boom winch smooth drum roller, (1) <br />CAT 430D backhoe. (1) side boom roller <br />Problems/Resolutions. <br />Visitors: <br />Reviewed By: M. Raub <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.