My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:49 PM
Creation date
7/3/2020 10:46:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2015
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br />r <br />DAILY FIELD REPORT Paee 1 of I <br />Project Name: Foothill Sanitary Landfill - Area 2A Report Number: 046 <br />Project Number: 14-101-01 Date: Tuesday 07/14/15 <br />Owner: Dept. of Public Works, San Joaquin County CQA Monitors: Jude <br />Contractor: R J Gordon Construction, Inc. M. Hu and <br />Weather: Clear Wind: 0-10 mph. <br />Temperature: Ap2rox. range 70- 95 F Other: <br />The contractor worked from 5:30 am to 5:30 pm. <br />Excavation: (1) CAT D6 dozer, (1) CAT 627 scraper graded Basin 1. Fill placement began in the southern portion of the <br />Basin. (1) CAT 825 provided compaction effort. One test was taken which passed compaction requirements. The D6 dozer <br />and scraper also removed cut in the area adjacent to the East slope gas main, this material was taken to the county daily cover <br />stockpile. (1) CAT 621 water pull was used to maintain excavations, haul roads and fill areas. <br />Slope Subgrade Preparation: Up to (6) laborers using hand tools continued to prepare the slope areas top and toe of the <br />north slope. <br />Access Road: No activity. <br />Foundation Layer: (1) water -pull continued to provide moisture for the foundation layer. <br />Sump /Lysimeter Construction: (1) Hitachi 300 excavator dug the trench for the Lysimeter / 24" Secondary Riser Pipes <br />both are in the same trench alignment. Lysimeter will be in the lower portion. <br />Soil Gas Collection Pipe: (1) CAT 320 excavator excavated a portion of the soil gas pipe on the eastern slope and a portion of <br />the floor. <br />North West Stockpile: No activity was observed. <br />South Stockpile 1 (Foundation): No activity was observed. <br />South Stockpile 2 (Operations): No activity was observed. <br />South Stockpile 3: No activity was observed. <br />Geosynthetics: Material delivery was light today. <br />Geosynthetic Liner: Geosynthetics deployment began today, starting in the NE corner at the tie in, and progressing towards <br />the west. Approximately 31,000 sq ft were deployed today. QA activities included monitoring of placement, trial welds and <br />seaming. <br />Equipment Onsite: (1) CAT D8T dozer, (1) CAT D6T LGP dozer, (1) CAT D6R dozer (with slope board) (1) CAT 621G water <br />pull, (4) CAT 627 scrapers, (1) 14H motorgrader, (1) CAT 825H compactor, (1) water truck, (1) Hitachi 300 excavator, (1) <br />CAT CS 54B smooth drum roller (vibratory type), (1) CAT TH160B folk lift, (1) CAT side -boom winch smooth drum roller, (1) <br />CAT 430D backhoe. (1) CAT 320 excavator. <br />Problems/Resolutions. <br />Visitors: K. Khilnani <br />Reviewed By: M. Raub <br />iw�y <br />
The URL can be used to link to this page
Your browser does not support the video tag.