My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:49 PM
Creation date
7/3/2020 10:46:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2015
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAILY FIELD REPORT Page 1 of 1 <br />Project Name: Foothill Sanitary Landfill - Area 2A Report Number: 049 <br />Project Number: 14-101-01 Date: Friday 07/17/15 <br />Owner: Dept. of Public Works, San Joaquin County CQA Monitors: Jude A <br />Contractor: R J Gordon Construction, Inc. M. Hu and <br />Weather: Clear Wind: 0-10 mph. <br />Temperature: Approx. range 70- 92 F Other: <br />The contractor worked from 5:30 am to 3:30 pm. <br />Excavation: (1) CAT D6 dozer and (1) CAT 627 scraper finish graded Basin 2. (1) CAT 621 water truck was used to maintain <br />excavations, haul roads and fill areas. <br />Slope Subgrade Preparation: Up to (6) laborers using hand tools continued to prepare the east slope and the cell floor. <br />Access Road: No activity. <br />Foundation Layer: (1) water -truck and 14 H motorgrader brushed over the foundation layer and (1) CAT 54B smooth drum <br />roller put finish surface on the floor <br />Sump /Lysimeter Construction: Great Basin placed FML in the lysimeter excavation. The seams have not yet been tested <br />Soil Gas Collection Pipe: Backfill of the pipe began after the gravel backfill and geotextile was overlapped per plan. A large <br />vibratory plate was used for compacting the backfill soil. The activity is not yet finished. <br />North West Stockpile: No activity was observed. <br />South Stockpile 2 (Operations): No activity was observed. <br />South Stockpile 3: No activity was observed. <br />Coarse Gravel: No activity was observed. <br />Geosynthetic Liner: Geosynthetics deployment continued on the north slope today. QA activities included monitoring of <br />placement, trial welds, seaming and collection of destructive seam samples. A cumulative quantity of approximately <br />113,000 SF of GCL and geomembrane have been deployed. The final loads of Geocomposite were delivered today. All liner <br />materials are now n site. s. <br />Relocate 12"Gas Main T&M: (1) Hitachi 300 excavator and (1) CAT 320 excavator were used interchangeably throughout <br />the day excavating the new LFG header pipe trench above the eastern slope in preparation for header modification and the <br />gas shut off Monday. <br />Equipment Onsite: (1) CAT D8T dozer, (1) CAT D6T LGP dozer, (1) CAT D6R dozer (with slope board) (1) CAT 621G water <br />pull, (2) CAT 627 scrapers, (1) 14H motorgrader, (1) CAT 825H compactor, (1) water truck, (1) Hitachi 300 excavator, (1) <br />CAT CS 54B smooth drum roller (vibratory type), (1) CAT TH160B folk lift,, (1) CAT 430D backhoe. (1) CAT 320 excavator. <br />Problems/Resolutions. <br />Visitors: <br />Reviewed By: M. Raub <br />J <br />n <br />u <br />Adtwnrand <br />Earth _qaefor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.