My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:49 PM
Creation date
7/3/2020 10:46:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2015
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br />DAILY FIELD REPORT Page 1 of 1 <br />Project Name: Foothill Sanitary Landfill - Area 2A Report Number: 080 <br />Project Number: 14-101-01 Date: Monday 08/31/15 <br />Owner: Dept. of Public Works, San Joaquin County CQA Monitors: R. Nogales <br />Contractor: R J Gordon Construction, Inc. M. Hu and <br />Weather: Clear - Hot Wind: 0-10 mph. <br />Tem erature: Apgrox. range 61- 94 F Other: <br />The contractor worked from 5:00 am to 4:30 pm. <br />Operations Layer Processing: Contractor continued screening of operations stockpile today at 6:00 am. (1) Hitachi 300 <br />excavator, (1) CAT D6 dozer (1) 950 M Loader was used to perform screening operations. The Hitachi 300 was used to load <br />soil from the western end of Stockpile 2 into the Power Screen screening plant. Screened product was stockpiled in a cone <br />using a belt stacker to keep the screened soil separate from unprocessed soil. (1) 950 M Loader was used relocate +1" from <br />under the belt into separate stockpile. (1) Sample collected from today's stacker belt stockpile. Full gradation was performed <br />in field lab. Lab results indicated 100 % Passing 1" Screen. Screening operation ended at 2:30 pm. <br />Operations Layer Placement: (1) Hyundai 300 loaded (2) Cat 745 Dump Truck with Screened Operations Layer for <br />placement on cell floor. (1) D6 LGP Dozer was used to spread Operations layer 2 ft thick over deployed 8 oz/sy geotextile <br />along middle of cell working to the north and west Random samples of Operations layer were hand sieved in field with 1" <br />screen during placement. Observed 100% passing 1" screen. Operations layser placement discontinued at 3:30 pm. <br />At approximately 7:00 am (1) Cat 745 Dump Truck tipped over while discharging load. Dump Truck was up righted and <br />parked for balance of day. (2) Laborers and (1) John Deere 410 Backhoe used to expose 8oz/sy geotextile in this location to <br />check for damage. No damage observed. <br />Gravel Drainage Material Placement: Import operation not running today. (1) CAT D6 LGP dozer equipped with GPS <br />spread previously stockpiled GDM in the center of cell floor pushing west this morning beginning at 5:00 am. (1) Laborer <br />controlled wrinkles. GDM placement discontinued at approximately 1:30 pm due to moderate to heavy wrinkles observed in <br />HDPE Liner. AES QA personnel monitored the placement and verified the depths of the placed LCRS gravel by using a dulled <br />probe. <br />The D6 Dozer tore a 4 by 6 ft cut through HDPE liner and GCL during grading of GDM middle of cell floor approximately 100 ft <br />south of the north slope. Liner repair was scheduled for 9/1/15. <br />Geotextile: No activity observed today. <br />Geocomposite: Geocomposite deployed on the north slope starting in the NE corner and proceeding to the West. Observed <br />nylon ties secured at 3 foot intervals along length and 6 -inch intervals along width. Geotextile seams were sewn using hand <br />sewing machine. Installation resulted in horizontal seams on the slope. The horizontal seams were joined per the <br />specifications and information provided by the Engineer. <br />Leachate Collection Pipe: Contractor welded portions of Leachate Collection Pipe at the toe of eastern slope. No gravel <br />placed at this time. <br />24" HDPE Riser Pipe: (1) Hitachi 300 excavator, (1) Hyundai 480LC excavator, and (1) CAT D4 Dozer were used to set <br />Primary Riser and Primary Inspection pipe in Sump. The perforated sections of the pipes were not set flush to the sump <br />floor. Contractor indicated that the pipes would be arranged to conform to the details. <br />Equipment Onsite: (1) CAT D6T LGP dozer, (2) water trucks, (1) Hitachi 300 excavator, (1) CAT TH160B folk lift, (1) John <br />Deere 410 Backhoe. (1) CAT 623 paddlewheel scraper. (1) Power Screen, (1) Belt Stacker, (1) Hyundai 480LC excavator, (1) <br />CAT D6T dozer, (2) Cat 745 Dump Truck, (1) Cat 950 M Loader (1) CAT D4 Dozer <br />Problems/Resolutions. <br />Visitors: M. Raub <br />Reviewed By: M. Raub <br />
The URL can be used to link to this page
Your browser does not support the video tag.