Laserfiche WebLink
DAILY FIELD REPORT Page 1 of 1 <br />Project Name: Foothill Sanitary Landfill - Area 2A Report Number: 103 <br />Project Number: 14-101-01 Date: Friday 10/02/15 <br />Owner: Dept. of Public Works, San Joaquin County CQA Monitors: <br />Contractor: R J Gordon Construction, Inc. M. Hu and <br />Weather: Clear Wind: 0-20m h. <br />Temperature: Ap2rox. range 60- 70 F Other: <br />The contractor worked from lam to 3:30 pm. <br />Electrical Panel Placement: Electricians continued with conduit and wiring on the Sump Pump Control panel. <br />Drainage Structures: Up to 3 laborers placed 8 oz/sy geotextile over Rip Rap subgrade areas of Basins 1 and 2. (1) Hyundai <br />480 excavator placed Rip Rap in the drainage channel profile of Basin 1. (1) CAT 745 truck Hauled material from the staged <br />stockpiles as needed. (1) Hitachi 300 excavator placed Rip Rap in Basin 2, assisted by (1) CAT 950 loader. (1) Cat D6 dozer <br />(1) CAT CP54 compactor continued to place the fill berm on the road atop the East slope per Section 35 on Sheet C-11 <br />Access Road: No activity observed. Rolling of subgrade, placement of pavement geotextile and placement of aggregate base <br />remain. <br />LCRS Force Main: (2) laborers used jackhammer to excavate holes for LCRS riser pipe supports. <br />Other: AES demobed at the end of the day and the County inspectors will look after the outstanding issues on the punch list. <br />Equipment Onsite: (1) CAT D6T LGP dozer, (2) water trucks, (1) Hitachi 300 excavator, (1) JD 410 Backhoe. (1) CAT 623 <br />paddlewheel scraper. (1) Hyundai 480LC excavator, (1) CAT D6T dozer, (2) Cat 745 Dump Truck, (1) Cat 950 M Loader, (1) <br />CAT D4 Dozer, (1) CAT 14MH Motor Grader, (1) CAT CP54 compactor. (1) CAT 613 scraper <br />Problems/Resolutions: <br />Visitors: <br />Reviewed By: M. Raub <br />