My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:49 PM
Creation date
7/3/2020 10:46:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2015
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAILY FIELD REPORT Page 1 of 1 <br />Project Name: Foothill Sanitary Landfill - Area 2A Report Number: 103 <br />Project Number: 14-101-01 Date: Friday 10/02/15 <br />Owner: Dept. of Public Works, San Joaquin County CQA Monitors: <br />Contractor: R J Gordon Construction, Inc. M. Hu and <br />Weather: Clear Wind: 0-20m h. <br />Temperature: Ap2rox. range 60- 70 F Other: <br />The contractor worked from lam to 3:30 pm. <br />Electrical Panel Placement: Electricians continued with conduit and wiring on the Sump Pump Control panel. <br />Drainage Structures: Up to 3 laborers placed 8 oz/sy geotextile over Rip Rap subgrade areas of Basins 1 and 2. (1) Hyundai <br />480 excavator placed Rip Rap in the drainage channel profile of Basin 1. (1) CAT 745 truck Hauled material from the staged <br />stockpiles as needed. (1) Hitachi 300 excavator placed Rip Rap in Basin 2, assisted by (1) CAT 950 loader. (1) Cat D6 dozer <br />(1) CAT CP54 compactor continued to place the fill berm on the road atop the East slope per Section 35 on Sheet C-11 <br />Access Road: No activity observed. Rolling of subgrade, placement of pavement geotextile and placement of aggregate base <br />remain. <br />LCRS Force Main: (2) laborers used jackhammer to excavate holes for LCRS riser pipe supports. <br />Other: AES demobed at the end of the day and the County inspectors will look after the outstanding issues on the punch list. <br />Equipment Onsite: (1) CAT D6T LGP dozer, (2) water trucks, (1) Hitachi 300 excavator, (1) JD 410 Backhoe. (1) CAT 623 <br />paddlewheel scraper. (1) Hyundai 480LC excavator, (1) CAT D6T dozer, (2) Cat 745 Dump Truck, (1) Cat 950 M Loader, (1) <br />CAT D4 Dozer, (1) CAT 14MH Motor Grader, (1) CAT CP54 compactor. (1) CAT 613 scraper <br />Problems/Resolutions: <br />Visitors: <br />Reviewed By: M. Raub <br />
The URL can be used to link to this page
Your browser does not support the video tag.