My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:49 PM
Creation date
7/3/2020 10:46:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2015
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
As-Built CQA Report for the Construction of Area 2A at the Foothill Sanitary Landfill <br /> San Joaquin County,California <br /> • Drainage Geocomposite Conformance Testing Summary <br /> ASTM Test Actual <br /> Parameter Method Unit Specification Range Average <br /> Geocom osite <br /> 1.23x10-3 at <br /> Design D4716 (M2/sec) 5x10.4 gradient=0.33 <br /> Transmissivity 9.86x10-4 at <br /> radient=0.50 <br /> Ply Adhesion- 2.8-3.3 Side A 3.1 Side A <br /> Average D7005 lbs/in 1.0 2.7-3.6 Side B 3.2 Side B <br /> Geonet <br /> Thickness D5199 mils 250 324-325 325 <br /> Density D1505 cm3 0.932 0.956 0.956 <br /> Carbon Black D1603 % 2 -3 2.34 and 2.36 2.35 <br /> Geotextile <br /> Apparent Opening 0.198-0.199 Side A 0.199 Side A <br /> Size(AOS) D4751 mm <0.2 0.197-0.199 Side B 0.198 Side B <br /> 9.0-9.1 Side A 9.1 Side A <br /> Mass per Unit Area D5261 oz/yd2 8 9.0-9.2 Side B 9.1 Side B <br /> 238-251 Side A MD 245 Side A MD <br /> 247-263 Side A TD 255 Side A TD <br /> Grab Tensile D6241 lbs 210 235-244 Side B MD 240 Side B MD <br /> 248-257 Side B TD 253 Side B TD <br /> 111-114 Side A MD 113 Side A MD <br /> • Trapezoid Tear D4491 lbs 56 128-129 Side A TD 129 Side A TD <br /> Strength 114-117 Side B MD 116 Side A <br /> 127-128 Side B TD 128 Side B <br /> 1.82-1.84 Side A 1.83 Side A <br /> Permittivity D4491 sec-1 1.0 1.75-1.77 Side B 1.76 Side B <br /> MD-Machine direction;TD-Transverse Direction <br /> 6.4.5 Interface Shear Strength Testing <br /> Interface shear testing was performed on individual interfaces as specified in the Technical <br /> Specifications and on multilayer interfaces (sandwich tests). Detailed discussion of the test <br /> procedures and test results are provided in AES Technical Memorandum (TM) dated July 13, 2015 <br /> included in Appendix C.2b. <br /> Initially,three series of single (individual) interface tests were performed: <br /> Test Series 1 - Foundation layer soil vs GCL <br /> Test Series 2 -GCL vs. HDPE geomembrane <br /> Test Series 3 -HDPE geomembrane vs.geocomposite <br /> P:114 Projects114-101(SJCDPW North County and Foothillff oothill CQAIReportlFinal ReportToothill CQA Rport-Final.docx <br /> 22 P-Offi- <br />
The URL can be used to link to this page
Your browser does not support the video tag.