My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:49 PM
Creation date
7/3/2020 10:46:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2015
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
As-Built CQA Report for the Construction of Area 2A at the Foothill Sanitary Landfill <br /> San Joaquin County,California <br /> • 10.5 DRAINAGE STRUCTURES <br /> Construction of Area 2A included earthen drainage channels, two storm water basins and two <br /> drainage culverts. AES CQA Monitors observed the grading of the earthen channels and basins to <br /> check conformance with the plans and details. AES also monitored placement of pipe bedding, 80 <br /> cu. yds. of CLSM trench backfill, and earthfill cover for the 30-inch diameter corrugated metal pipe <br /> installed under the access ramp adjacent to the lined area.AES observed bedding and CLSM backfill <br /> placement to ensure trench backfill materials were placed to properly surround the pipe and <br /> without causing any damage. Two sets of cylinders of the CLSM samples were collected for <br /> compression testing. The 28 day compressive strengths were 160 psi and met the Specifications <br /> (150 psi minimum). The CQA Monitor also provided observation and testing of earthfill cover over <br /> the completed CLSM backfill section. The earthfill was placed with CAT D4 and D6 dozers and <br /> compacted by a CAT CP54 self-propelled sheepsfoot compactor. The backfill was moisture <br /> conditioned and compacted to 95 percent relative compaction based on ASTM D1557. Density test <br /> results for the earthfill are provided in Table 1. Observation during placement of rip rap, cushion <br /> geotextile, and turf reinforcement mats in the drainage channels was performed by County <br /> inspectors. <br /> 10.6 LEACHATE COLLECTION PIPING,PUMP AND CONTROLS <br /> • Area 2A construction included mechanical, electrical and piping to facilitate pumping of leachate to <br /> the existing leachate storage tank near the flare station southeast of Area 2A. The components of <br /> this work included: <br /> ■ A 5 hp submersible pump in the primary leachate riser; <br /> ■ An electronic water level sensor and bubbler in the primary leachate riser; <br /> ■ Bubbler water level sensors in the secondary leachate and lysimeter risers; <br /> ■ Below grade force main and a spare force main for a future tank connection consisting of <br /> 4-inch diameter HDPE SDR 17 pipes; <br /> ■ Flow routing rack with a sample port, flow meter, pressure gauge, check valve,ball valve and <br /> strainer; <br /> ■ Below grade electrical power and signal wiring and conduit within trenches; and, <br /> ■ Electrical control panel. <br /> The County personnel performed the mechanical and electrical inspection. AES CQA Monitors <br /> provided monitoring of pressure testing of the force main segments as they were constructed. The <br /> force main was pressurized with water to 120 psi and monitored for pressure drop over 1 hour. <br /> • <br /> P:114 Projects114-101(SJCDPW North County and Foothiliffoothill CQA1ReportlFinal ReportToothill CQA Rport-Final.docx <br /> 36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.