C <br />DAILY FIELD REPORT Page 1 of 1 <br />Project Name: Foothill Sanitary Landfill - Area 2A Report Number: 038 <br />Project Number: 11-101-01 Date: Thursday 07/02/15 <br />Owner: Dept. of Public Works, San Joaquin County CQA Monitors: T. Sathees <br />Contractor: R J Gordon Construction, Inc. M. Hu and <br />Weather: Clear Wind: 0-10 mph. <br />Temperature: Approx. range 70-101 F Other: <br />The contractor worked from 7:00 am to 3:30 pm. <br />Excavation: Up to (1) CAT D8 and (1) CAT D6 dozers and (4) CAT 627 scrapers continued excavating Drainage Basin 2 at <br />southeast of the project area, and hauled the material to the South Stockpile 3. <br />(1) CAT 621 water pull was used to maintain excavations, haul roads and stockpile areas. <br />Slope Subgrade Preparation: (1) Hitachi 300 excavator was used for finish grading the east slopes. <br />Access Road: No activity was observed. <br />Foundation Layer: The Contractor continued processing and fine grading the surface soil in order to achieve smooth and <br />clod -free surface, which is required prior to liner installation. (1) CAT 14H motorgrader was used for spreading, mixing and <br />fine grading the soil. (1) CAT 621 water pull was used to moisture -condition the Foundation soil. <br />The Contractor continue hand-picking big clods and rocks that were found on the surface of the Foundation layer. <br />Sump Construction: (1) Hitachi 300 excavator continued excavating the sump part time. <br />North West Stockpile: No activity was observed. <br />South Stockpile 1 (Foundation): No activity was observed. <br />South Stockpile 2 (Operations): No activity was observed. <br />South Stockpile 3: The scrapers hauled and stockpile the soil from the excavation at Drainage Basin 2 at southeast corner of <br />the project area. <br />Geosynthetics: (3) laborers from Great Basin onsite and continued filling sandbags with soil from operations layer stockpile. <br />One truck load of 8 oz geotextile was unexpectedly delivered and temporarily stored in the equipment yard. The contractor <br />began to prepare a more suitable storage area right away and began rectify the situation. (46) Rolls of 8 oz geotextile were <br />delivered. <br />Equipment Onsite: (1) CAT D8T dozer, (1) CAT D6T LGP dozer, (1) CAT D6R dozer (with slope board) (1) CAT 621G water <br />pull, (4) CAT 627 scrapers, (1) 14H motorgrader, (1) CAT 825H compactor, (1) water truck, (1) Hitachi 300 excavator, (1) <br />CAT CS 54B smooth drum roller (vibratory type), (1) CAT TH160B folk lift, (1) CAT side -boom winch smooth drum roller, (1) <br />CAT 430D backhoe. <br />Problems/Resolutions. <br />Visitors: <br />Reviewed By: M. Raub <br />MEAdtWn <br />Fath 5tfe Int. <br />