My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:49 PM
Creation date
7/3/2020 10:46:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2015
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br />C <br />DAILY FIELD REPORT Page 1 of 1 <br />Project Name: Foothill Sanitary Landfill - Area 2A Report Number: 032 <br />Project Number: 11-101-01 Date: Wednesday 06/24/15 <br />Owner: Dept. of Public Works, San Joaquin County CQA Monitors: T. Sathees <br />Contractor: R J Gordon Construction, Inc. M. Hu and <br />Weather: Clear Wind: 0-10 mph. <br />Tem erature: ARprox. range 70-100 F Other: <br />The contractor worked from 7:00 am to 5:30 pm. <br />Excavation: Up to (1) CAT D8 dozer, (1) CAT D6 dozer, (2) CAT 637 scrapers and (2) CAT 627 scrapers continued excavating <br />Drainage Basin 2 at southeastern portion of the project area and from the southeast slope area. The material was hauled to <br />the South Stockpile 3. After 3:30 pm the excavation activity at Drainage Basin 2 was stopped. <br />(1) CAT D6 dozer grade the slopes at Access Road at Northwest of the cell. <br />(1) CAT 621 water pull was used to maintain excavation areas, haul roads and stockpiles. <br />South Stockpile 1 (Foundation): No activity was observed. <br />South Stockpile 2 (Operations): No activity was observed. <br />South Stockpile 3: The scrapers hauled and stockpiled the soil from the excavation at Drainage Basin 2. <br />Access Road Embankment Fill (Earthfill): No activity was observed. <br />Subgrade Earthfill: No activity was observed. <br />Foundation Layer: The Contractor continued placing Foundation layer at Northeast to South east and along east toe of the <br />floor. (1) CAT 825 compactor compacted the Foundation layer prior to placement of new material. (2) CAT 627 scrapers <br />hauled the fine-grained soil from the designated borrow area, located southwest of Drainage Basin 2 and placed thin lifts. The <br />825 compactor and a vibratory -type CAT CS54B smooth -drum roller were used to break the big clods and to compact the <br />Foundation soil. (1) CAT 14H motorgrader was used for spreading and mixing the soil. (1) CAT 621 water pull was used to <br />moisture -condition the Foundation soil. At 3:30 pm hauling activity (scrapers) was stopped as to provide more time for <br />processing to break down clods with smooth drum roller, motorgrader and the compactor. <br />The Contractor also utilized the scraper traffic to provide additional processing and compaction to the Foundation layer at <br />floor area. Two locations were examined at the east half of the floor area in order to evaluate the effectiveness of the <br />processing -effort to help assist the Contractor. It was found that approximately 5.6 to 8.2 % of the material had clods sizes of <br />1 to 2 inches, with scattered plus 2 -inch size clods. The Contractor was advised to provide more processing effort at SE <br />portion where tests showed considerable amounts of clods. Two samples were obtained, and the fines content were 38.4 and <br />41.7 %. All material passed through 3/8" sieve. Density testing on the Foundation layer soil indicated compliance with the <br />specifications. <br />Equipment Onsite: (1) CAT D8T dozer, (1) CAT D6T dozer, (1) CAT D6R dozer (with slope board) (1) CAT 621G water pull, <br />(4) CAT 627 scrapers, (2) CAT 637 scrapers, (1) 14H motorgrader, (1) CAT 825H compactor, (1) water truck, (1) Hitachi 300 <br />excavator, (1) CAT CS 54B smooth drum roller (vibratory type). <br />Problems/Resolutions. <br />Visitors: <br />Reviewed By: M. Raub <br />Ads,Wnilmd <br />Earth SdesweA, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.