My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:49 PM
Creation date
7/3/2020 10:46:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2015
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAILY FIELD REPORT Page 1 of 1 <br />Project Name: Foothill Sanitary Landfill - Area 2A Report Number: 028 <br />Project Number: 11-101-01 Date: Thursday 06/18/15 <br />Owner: Dept. of Public Works, San Joaquin County CQA Monitors: T. Sathees <br />Contractor: R J Gordon Construction, Inc. M. Hu and <br />Weather: Clear Wind: 0-10 mph. <br />Temperature: A2prox. range 70-100 F Other: <br />The contractor worked from 7:00 am to 5:30 pm. <br />Excavation: Up to (1) CAT D6, (1) CAT D8 and up to (2) CAT 627 and (2) CAT 637 scrapers continued excavating Drainage <br />Basin 2 at southeast of the project area and southeast slope area, and hauled the material to the South Stockpile 3. After 3:30 <br />pm the excavation activity was stopped. (1) CAT 621 water pull was used to maintain excavation areas. <br />Two laborers with shovels and rakes working on the north slopes to fine grade the slope face. <br />(1) CAT 14H motorgrader and (1) CAT D6 dozer part time trimmed the upper slopes along east side of the cell. <br />South Stockpile 1 (Foundation): (2) CAT 627 scrapers continued hauling the Foundation soil, from 7:00 am to 3:30 pm, to <br />placement area at the cell. <br />South Stockpile 2 (Operations): No activity was observed. <br />South Stockpile 3: The scrapers hauled and stockpile the soil from the excavation at Drainage Basin 2 at Southeast of the <br />project area. (1) CAT 621 water pull was used to maintain the stockpile and haul roads. <br />Access Road Embankment Fill (Earthfill): No activity was observed. <br />Subgrade Earthfill: No activity was observed. <br />Foundation Layer: Foundation layer was placed today at Southwest to Northwest area of the cell floor. (1) CAT 825 <br />compactor compacted the Foundation layer prior to placement of new material. (2) CAT 627 scrapers hauled the soil from <br />South Stockpile 1 (Foundation) and placed thin lifts. The 825 compactor and a vibratory -type CAT CS54B smooth -drum roller <br />were used to break down clods and to compact the Foundation soil. (1) CAT 14H motorgrader was used for spreading and <br />mixing the soil. (1) CAT 621 water pull was used to moisture -condition the subgrade and Foundation soil. At 3:30 pm hauling <br />activity (scrapers) was stopped as to provide more time for processing to break down clods with the smooth drum roller, <br />motorgrader and the compactor. <br />The Contractor also utilized the scraper traffic, which were hauling and stockpiling the material from excavation areas to <br />provide additional processing and compaction to the Foundation layer at Northeast to Southeast area that was placed <br />yesterday (where a 6 to 7 -inch thick compacted layer is achieved). Four locations at Southwest floor area were examined in <br />order to evaluate the effectiveness of the processing -effort to help assist the Contractor. It was found that the approximately <br />4.5 to 11.7 % of the material had clods sizes of 1 to 2 inches, with scattered plus 2 -inch size clods. Four samples were <br />obtained, and the fines content was 32.5 to 41.5 %. All material passed through 3/8" sieve. One check point also conducted on <br />Foundation soil to help select the appropriate compaction curve. Density testing on the Foundation layer soil indicated <br />compliance with the specifications. <br />Equipment Onsite: (1) CAT D8T dozer, (1) CAT D6T dozer, (1) CAT D6R dozer (with slope board) (1) CAT 621G water pull, <br />(4) CAT 627 scrapers, (2) CAT 637 scrapers, (1) 14H motorgrader, (1) CAT 825H compactor, (1) water truck, (1) Hitachi 300 <br />excavator, (1) CAT CS 54B smooth drum roller (vibratory type). <br />Problems/Resolutions. <br />Visitors: <br />Reviewed By: M. Raub <br />
The URL can be used to link to this page
Your browser does not support the video tag.