C. <br />DAILY FIELD REPORT Page 1 of 1 <br />Project Name: Foothill Sanitary Landfill - Area 2A Report Number: 026 <br />Project Number: 11-101-01 Date: Tuesday 06/16/15 <br />Owner: Dept. of Public Works, San Joaquin County CQA Monitors: T. Sathees <br />Contractor: R J Gordon Construction, Inc. M. Hug and <br />Weather: Clear Wind: 0-10 mph. <br />Temperature: ARprox. range 70-100 F Other: <br />The contractor worked from 7:00 am to 5:30 pm. <br />Excavation: Up to (1) CAT D6, (1) CAT D8 and up to (4) CAT 627 scrapers continued excavating Drainage Basin 2 at <br />southeast of the project area and hauled the material to the South Stockpile 3. After 3:30 pm the excavation activity was <br />stopped. (1) CAT 621 water pull was used to maintain excavation areas. <br />(1) Hitachi 300 excavator was used to remove and trim the soil at high spots at slopes along north and northwest side of the <br />cell. One laborer assisted the process with a shovel. <br />(1) CAT 14H motorgrader and (1) CAT D6 dozer part time trimmed the upper slopes along east side of the cell. <br />South Stockpile 1 (Foundation): The scrapers stockpiled few loads of fine-grained materials hauled from the excavation at <br />Drainage Basin 2. (2) CAT 637 scrapers continued hauling the Foundation soil, from 7:00 am to 3:30 pm, to placement area at <br />the cell. <br />South Stockpile 2 (Operations): No activity was observed. <br />South Stockpile 3: The scrapers hauled and stockpile the soil from the excavation at Drainage Basin 2 at Southeast of the <br />project area. (1) CAT 621 water pull was used to maintain the stockpile and haul roads. <br />Access Road Embankment Fill (Earthfill): No activity was observed. <br />Foundation Layer: Foundation layer was placed today at Northwest area of the cell floor. (1) CAT 825 compactor prepared <br />the subgrade prior to placement of the Foundation layer soil. (2) CAT 637 scrapers hauled the soil from South Stockpile 1 <br />(Foundation) and placed thin lifts. The 825 compactor and a vibratory -type CAT CS54B smooth -drum roller (from afternoon) <br />were used to break the big clods and to compact the Foundation soil. (1) CAT 14H motorgrader was used for spreading and <br />mixing the soil. (1) CAT 621 water pull was used to moisture -condition the subgrade and Foundation soil. At 3:30 pm hauling <br />activity (scrapers) was stopped as to provide more time for the processing effort to break down clods at the fill by smooth <br />drum roller, motorgrader and the compactor only. <br />The Contractor also utilized the scraper traffic, which were hauling and stockpiling the material from excavation areas to <br />provide additional processing and compaction to the Foundation layer at Southwest portion placed yesterday (where a 6 to 7 - <br />inch thick compacted layer was achieved). Three locations at Southwest floor area were examined in order to evaluate the <br />effectiveness of the processing -effort to help assist the Contractor. It was found that the approximately 6-12 % of the material <br />had clods sizes of 1 to 2 inches, with scattered plus 2 -inch size clods. Two samples were obtained, and the fines content was <br />39% for both samples. All soil passed through 3/8" sieve. Density testing on the Foundation layer indicated compliance with <br />the specifications. <br />Equipment Onsite: (1) CAT D8T dozer, (1) CAT D6T dozer, (1) CAT D6R dozer (with slope board) (1) CAT 621G water pull, <br />(4) CAT 627 scrapers, (2) CAT 637 scrapers, (1) 14H motorgrader, (1) CAT 825H compactor, (1) water truck, (1) Hitachi 300 <br />excavator, (1) CAT CS 54B smooth drum roller (vibratory type). <br />Problems/Resolutions. <br />Visitors: M. Raub <br />Reviewed By: M. Raub <br />Irk <br />