My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:49 PM
Creation date
7/3/2020 10:46:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2015
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAILY FIELD REPORT Paize 1 of 1 <br />Project Name: Foothill Sanitary Landfill - Area 2A Report Number: 025 <br />Project Number: 11-101-01 Date: Monday 06/15/15 <br />Owner: Dept. of Public Works, San Joaquin County CQA Monitors: T. Sathees <br />Contractor: R J Gordon Construction, Inc. M. Hu and <br />Weather: Clear Wind: 0-10 mph. <br />Temperature: A2prox. range 70-100 F Other: <br />The contractor worked from 7:00 am to 5:30 pm. <br />Excavation: Up to (1) CAT D6, (1) CAT D8 and up to (3) CAT 627 scrapers continued excavating Drainage Basin 2 at <br />southeast of the project area and hauled the material to the South Stockpile 3. After 3:30 pm the excavation activity was <br />stopped. <br />(1) Hitachi 300 excavator was used to remove and trim the soil at high spots at slopes along north and east side of the cell. <br />One laborer assisted the process with a shovel. <br />(1) CAT 14H motorgrader and (1) CAT D6 dozer part time trimmed the upper slopes along east side of the cell. (1) CAT 621 <br />water pull was used to maintain excavation areas. <br />South Stockpile 1 (Foundation): (1) CAT 82S compactor was used to break the big clods in the morning. (1) CAT 621 water <br />pull assisted the processing by moisture conditioning the stockpile. <br />South Stockpile 2 (Operations): No activity was observed. <br />South Stockpile 3: The scrapers hauled and stockpile the soil from the excavation at Drainage Basin 2 at Southeast of the <br />project area. (1) CAT 621 water pull was used to maintain fill areas, and haul roads. <br />Access Road Embankment Fill (Earthfill): No activity was observed. <br />Foundation Layer: (1) CAT 825 compactor prepared the subgrade prior to placement of the Foundation layer soil. Mid- <br />morning, (2) CAT 637 scrapers (replaced with two CAT 627 from 3:30 to 4:30 pm) started hauling the soil from South <br />Stockpile 1 (Foundation) and placed thin lifts at south west area of the cell floor. The 825 compactor was used to break the <br />big clods and to compact the Foundation soil. (1) CAT 14H motorgrader was used for spreading and mixing the soil. (1) CAT <br />621 water pull was used to moisture -condition the subgrade and Foundation soil. Three locations (where 3 -4 -inch thick of <br />Foundation layer is achieved) were examined in order to evaluate the effectiveness of the processing -effort to help assist the <br />Contractor. It was found that the approximately 15 % of the material had clods sizes of 1 to 2 inches, with scattered plus 2 - <br />inch size clods. The contractor was advised that additional effort to break down the bigger clods would be needed. One <br />composite sample was obtained, and the fines content was 32 % of the portion finer that 3/8 -inch. One check point was also <br />conducted on the composite sample to help select the appropriate compaction curve. <br />Equipment Onsite: (1) CAT D8T dozer, (1) CAT D6T dozer, (1) CAT D6R dozer (with slope board) (1) CAT 621G water pull, <br />(4) CAT 627 scrapers, (3) CAT 637 scrapers, (1) 14H motorgrader, (1) CAT 825H compactor, (1) water truck, (1) Hitachi 300 <br />excavator. <br />Problems/Resolutions. <br />Visitors: M. Raub <br />Reviewed By: M. Raub <br />I . 1 0. F, i �_" - - <br />N <br />7 <br />