Laserfiche WebLink
DAILY FIELD REPORT Page 1 of 1 <br />Project Name: Foothill Sanitary Landfill - Area 2A Report Number: 022 <br />Project Number: 11-101-01 Date: Thursday 06/11/1S <br />Owner: Dept. of Public Works, San Joaquin County CQA Monitors: M. Hu and ::J <br />Contractor: R J Gordon Construction, Inc. <br />Weather: Clear Wind: 0-10 mph. <br />Temperature: A2prox. range 70-93 F Other: <br />The contractor worked from 7:00 am to 5:30 pm. AES onsite part time. <br />Excavation: Up to (1) CAT D6, (1) CAT D8 and (2) CAT 627 scrapers began excavation of the Basin 1 area and hauled the <br />material to the adjacent NW stockpile for daily cover. <br />South Stockpile 1 (Foundation): No activity was observed. <br />South Stockpile 2 (Operations): No activity was observed. <br />Access Road Embankment Fill (Earthfill): No activity was observed. <br />Subgrade Earthfill: Up to (1) CAT D6 (2) CAT 627 scrapers, and (1) CAT 14H motorgrader fine graded the floor area. Small <br />fills were made in the fine grade operations of less than 1 foot. (1) CAT 825 compacted and reworked the excavated surface in <br />the floor of the cell, then the blade graded behind the CAT 825 <br />Expose Existing Liner: (1) Hitachi LS300 and (2) laborers continued to expose the existing liner on the North slope. <br />Equipment Onsite: (1) CAT D8T dozer, (1) CAT D6T dozer, (1) CAT D6R dozer (with slope board) (1) CAT 621G water pull, <br />(4) CAT 627 scrapers, (3) CAT 637 scrapers, (1) 14H motorgrader, (1) CAT 825H compactor, (1) water truck, (1) Hitachi 300 <br />excavator. <br />Problems/Resolutions. <br />Visitors: <br />Reviewed By: M. Raub <br />