C <br />DAILY FIELD REPORT Page 1 of 1 <br />Project Name: Foothill Sanitary Landfill - Area 2A Report Number: 024 <br />Project Number: 11-101-01 Date: Friday 06/12/15 <br />Owner: Dept. of Public Works, San Joaquin County CQA Monitors: M. Hu and <br />Contractor: R J Gordon Construction, Inc. <br />Weather: Clear Wind: 0-10 mph. <br />Tem erature: A2prox. range 70-102 F Other: <br />The contractor worked from 7:00 am to 5:30 pm. AES onsite part time. <br />Excavation: Up to (1) CAT D6, (1) CAT D8 and up to (4) CAT 627 scrapers began excavation in the morning of the Basin 1 <br />area and hauled the material to the adjacent NW stockpile for daily cover. In the afternoon, activities moved to Basin 2 area, <br />where up to (4) CAT 627 scrapers hauled excavated material and stockpiled at the southeast corner of the contractor's yard. <br />A water pull was used for dust control. <br />South Stockpile 1 (Foundation): (1) CAT 82S compactor was observed breaking up materials in the stockpile by making <br />repeated passes. <br />South Stockpile 2 (Operations): No activity was observed. <br />Access Road Embankment Fill (Earthfill): No activity was observed. <br />Subgrade Earthfill: F3 (Contractor's Surveyor) took shots on foundation layer subgrade in the floor area and side slope <br />Subgrade on adjacent northern and eastern slopes. At the contractor's direction, (1) Hitachi 300 excavator and (2) laborers <br />made corrections on the north slope. <br />Foundation Layer: The contractor stated that Foundation Layer soil placement would be starting on Monday. <br />Equipment Onsite: (1) CAT D8T dozer, (1) CAT D6T dozer, (1) CAT D6R dozer (with slope board) (1) CAT 621G water pull, <br />(4) CAT 627 scrapers, (3) CAT 637 scrapers, (1) 14H motorgrader, (1) CAT 825H compactor, (1) water truck, (1) Hitachi 300 <br />excavator. <br />Problems/Resolutions. <br />Visitors: <br />Reviewed By: M. Raub <br />W <br />v&. m +R . il4 tr �:t LliuEu <br />