Laserfiche WebLink
DAILY FIELD REPORT Page 1 of 1 <br />Project Name: Foothill Sanitary Landfill - Area 2A Report Number: 019 <br />Project Number: 11-101-01 Date: Friday 06/05/15 <br />Owner: Dept. of Public Works, San Joaquin County CQA Monitors: T. Sathees <br />Contractor: R J Gordon Construction, Inc. <br />Weather: Clear Wind: 0-10 mph. <br />Temperature: ARprox. range 60-90 F Other: <br />The contractor worked from 7:00 am to 5:30 pm. <br />Excavation: 7:00 am to 5:30 pm. Up to (2) CAT D6 and (1) CAT D8 dozers with ripper attachments assisted up to (4) CAT 627 <br />and (2) CAT 637 scrapers load material from the excavation along north and east sides of the cell, and excavation of existing <br />ramp at northwest corner of the cell. The soil was hauled and stockpiled at North West Stockpile for use as daily cover for <br />current landfill operations, and to Earthfill construction along south side of the cell. The soil was hauled on an approximate 5 - <br />min cycle. <br />(1) CAT 14H motorgrader and (1) CAT D6 dozer (with slope board attachment) part time trimmed the slopes along north and <br />east sides of the cell. (1) CAT 621 water pull was used to maintain excavation areas and slopes. <br />North West Stockpile: 7:30 am to 5:30 pm. The scrapers hauled soil from the excavations to North West Stockpile. (1) CAT <br />14H motorgrader was observed part time spreading and grading the soil in the Stockpile fill areas and maintaining haul <br />roads. (1) CAT 621 water pull was used to maintain fill areas, and haul roads. <br />South Stockpile 1 (Foundation): No activity was observed. <br />South Stockpile 2 (Operations): No activity was observed. <br />Access Road Embankment Fill (Earthfill): No activity was observed. <br />Subgrade Earthfill: 7:00 pm to 5:30 pm. The scrapers hauled the soil from the excavation areas and placed Earthfill along <br />south side of the cell. (1) CAT 621 water pull moisture -conditioned the Earthfill. (1) CAT 825 compactor was used to break <br />the clods and to compact the Earthfill. Density testing on the Earthfill indicated compliance with the specifications. <br />Equipment Onsite: (1) CAT D8T dozer, (1) CAT D6T dozer, (1) CAT D6R dozer (with slope board) (1) CAT 621G water pull, <br />(4) CAT 627 scrapers, (3) CAT 637 scrapers, (1) 14H motorgrader, (1) CAT 825H compactor, (1) water truck <br />Problems/Resolutions. <br />Visitors: <br />Reviewed By: M. Raub <br />C7 <br />