Laserfiche WebLink
2.1 Key Safety Personnel <br /> CB&I will oversee and act accordingly during all phases of the project. The following management <br /> structure will be instituted to successfully and safely completing this project. <br /> Health Safety&Environmental Manager <br /> Greg McElroy <br /> CB&I—Pittsburgh,PA <br /> (412)858-1542 <br /> The specific duties of the technical advisors include: <br /> Providing technical input into the design and implementation of the site HASP <br /> Advising on potential for worker exposure to project hazards along with appropriate methods and/or <br /> controls to eliminate site hazards. <br /> The following people share responsibility for health and safety at the site. See Section 2.1.1 for a <br /> description of the role and responsibility of each. <br /> Project Manager (office) 619-279-4251 <br /> (cellular) <br /> Site Supervisor (office) 925-595-4251 <br /> (cellular); <br /> Site Health and Safety Officer (office) 925-595-4251 <br /> (cellular) <br /> Client Representative (office) 209-953-7422 <br /> (cellular) <br /> Health, Safety&Env. Manager-Greg McElroy 412-858-1542(office) <br /> 412-759-5302(cellular) <br /> EPFC Manager HSE-Barry Conaway 609-510-1134(cellular) <br /> 2.1.1 Responsibilities of Key Personnel <br /> 2.1.1.1 Project Manager <br /> The Project Manager, as CB&I's project leader and principal project representative is responsible for <br /> leading the project team to achieve the project's HSE goals. The Project Manager is accountable to <br /> CB&I's Management and to the Client's Management for the CB&I Team Performance on the project. <br /> The PM has authority to direct response operations; the PM assumes total control over site activities. In <br /> addition,the PM: <br /> • Prepares and organizes background review of the project,the work plan,and the field team. <br /> • Ensures the responsibilities as outlined in CMS-710-02-PR-05300 Extra Hazardous and Repair <br /> Work are maintained during the project. <br /> • On a monthly basis conducts an additional compliance inspection using the Project HSE Inspection <br /> Form (CMS-710-05-FM-01402) (Appendix A) or the Shop and Warehouse HSE Inspection Form <br /> (CMS 710-05-FM-01403) to document this inspection. A copy shall be forwarded to the HSE <br /> Manager <br /> • Obtains permission for site access and coordinates activities with appropriate officials. <br /> 2-1 <br />