My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GeoSyntec Consultants <br />• Tests performed <br />• Specified locations inspected <br />• Summary of the completed Daily Inspection Diary Sheets <br />• Signature of the CQA Officer <br />7.4 Acceptance of Completed Components <br />The CQA Team will approve the WU B final cover installation when: <br />• The installation is completed in accordance with the requirements of the Project <br />Plans, Specifications, and this CQA Plan. <br />• Repairs are complete. <br />• The Owner has received necessary documentation from the Contractor. <br />Daily Inspection Sheets, monthly construction summaries, inspection photographs, <br />and test results will be reviewed by the CQA Officer. Reports will be evaluated for <br />internal consistency, accuracy, and completeness. These reports will be reviewed in a <br />timely manner. <br />The daily reports will be summarized into periodic acceptance reports. The reports <br />will indicate that work has been completed and approved according to the specified <br />design. These reports will be included in the project files and available to the <br />appropriate regulatory agencies. <br />7.5 Document Control and Storage <br />During construction, the CQA Officer will be responsible for all CQA documents <br />and organization of the documents for easy access. The CQA Officer will be <br />responsible for keeping duplicate records for all documentation at another location. The <br />CQA Officer will be responsible for incorporating any revisions to the CQA Plan and <br />distributing revised copies to the Contractors, Installers, and all other relevant parties. <br />0 J:WLLMD\FORWARD\CLOSURE\REPORrCQA REPORT 7-3 99.11.30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.