My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GeoSyntec Consultants <br />• Identification of construction problems and their solution or disposition. <br />• Description and title of specific inspection activities. <br />• Time the activity was performed. <br />• Location of the inspection activity. <br />• Standard test method used or type of inspection activity. <br />• Test equipment used, and calibrations, if applicable. <br />• Record of observation and test data, with all calculations completed and <br />checked. <br />• Construction methods and equipment origin material and general description of <br />condition. <br />• Comparison of test results and observations with specification requirement. <br />• Names and titles of all persons involved in inspection activity. <br />• Record of materials and workmanship that do not meet specified design and <br />corrective action measures taken. <br />• Signature of appropriate CQA inspection personnel. <br />7.3 Monthly Construction Summaries <br />The Monthly Construction Summary will be prepared by the CQA Officer and <br />include the following items: <br />• Inspection dates <br />• Time spent on the site <br />• Activities performed <br />D <br />7 <br />1:W LIED\FORWARD\CLOSURE\REPORT\CQAREPORT 7-2 99.11.30 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.