Laserfiche WebLink
GeoSyntee Consultants <br />Upon completion of construction, Forward Landfill, Inc., will store copies of the <br />CQA documents. All documentation will be maintained through the post -closure <br />monitoring periods of the facility. <br />7.6 Final COA Report <br />At the completion of the project, a Final CQA Report, including as -built drawings, <br />will be prepared and sent to Forward, Inc. for transmittal to the Regional Water Quality <br />Control Board. This report will include all necessary documentation, including third <br />party laboratory test results, to demonstrate that the final cover construction proceeded <br />in accordance with the Project Plans, Specifications, and CQA Plan. Because there are <br />often revisions to the design during construction, as -built drawings will be prepared. <br />The as -built drawings will include survey drawings showing the top of foundation layer, <br />top of clay, top of vegetative layer, edge of final cover, top of perimeter pipe draining <br />toward surface water pond and any necessary revisions to the Project Plans and details. <br />The final CQA report will be stamped by the CQA Officer who must be a registered <br />civil engineer or certified engineering geologist in the state of California. 9 <br />]:\ALLIED\FORWARD\CLOSURE\REPORTiCQA REPORT 7-4 99.11.30 <br />