My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GeoSyntec Consultants <br />work will be performed by Forward prior to final waste acceptance. The foundation <br />layer will be compacted to a minimum relative compaction of 90% (ASTM D1557). <br />On-site sandy lean clays will be used to construct the compacted clay liner. These <br />clays were used to construct the compacted clay liners within the base liners of WMU's <br />D-87, D-88, D-89 and the Eastern Ash Pit. Hydraulic conductivity values from field <br />testing for the Eastern Ash Pit typically ranged from 1 x 10-6 to 1 x 10-7 cm/s when <br />tested with air entry permeameters. These field tests are in the appendix to this CQA <br />Plan. The clay liner will be compacted to a minimum relative compaction of 90% <br />(ASTM D1557), at a water content that will result in a hydraulic conductivity of <br />1 x 10-6 cm/s or less. <br />If the on-site clays do not meet the hydraulic conductivity requirement of 1x106 <br />cm/s or less, an offsite clay (NARCO clay from Ione, CA) can be imported and <br />admixed with the on-site sandy lean clays for construction of the compacted clay liner. <br />This type of admixed clay liner has been used successfully in the construction of the <br />base liners for WMUs D-93, D-95, D-97, D-98, and D-99. A clay liner material <br />evaluation program was conducted in 1993 for the construction of the compacted clay <br />liner within D-93. When the on-site sandy clays were admixed with 25% MARCO clay, <br />and compacted to a minimum relative compaction of 90% at a water content of 2 to 5% <br />above optimum (ASTM D1557), a field hydraulic conductivity of 5 x 10-8 cm/s was <br />measured with a large-scale, sealed double ring infiltrometer (SDRI) installed through a <br />soil test pad. A copy of the clay liner material evaluation report for the admixed clay <br />liner, including the SDRI test result, is included in the appendix to this CQA Plan. <br />The vegetative layer will be constructed with on-site silty and clayey sands (SM) or <br />(SC). The soils shall be placed at a minimum relative compaction of 85% (ASTM <br />D1557). A minimum 2 -inch thick organic layer of shredded green waste or straw/hay <br />will be placed over the vegetative layer after placing the grass seed mix. This organic <br />layer will help retain moisture for seed germination as well as minimize raindrop impact <br />and associated erosion. Forward has successfully used the following seed mix, from <br />JDM Landscaping in Lodi, California, for erosion control at the site: <br />50% Annual Ryegrass <br />15% Gosse Subterranean Clover, Pel-Koted <br />C <br />J:WLLIED\FORWARD\CLOSURE\REPORT\CQA REPORT 2-2 99.11.30 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.