Laserfiche WebLink
C <br />GeoSyntec Consultants <br />10% Hykon Rose Clover, Pel-Koted <br />10% Crimson Clover, Pel-Koted <br />6% California Poppy <br />• 5% Bachelor Buttons <br />• 2% Garden Favorites Wildflower Mixture <br />• 2% Lupine -Blue <br />An alternative, monolithic final cover may be pursued by Forward for the WMU B <br />closure in lieu of the prescriptive cover. Per §21090, the RWQCB can allow any <br />alternative final cover design that it finds will continue to isolate the waste in the Unit <br />from precipitation and irrigation waters at least as well as would a final cover built in <br />accordance with applicable prescriptive standards. Forward will evaluate the <br />appropriateness of a monolithic final cover at the landfill site. If appropriate, Forward <br />will propose a monolithic final cover design to be incorporated into the closure <br />construction and an amended CQA Plan. <br />J:\ALLIED\FORWARD\CLOSURE\REPORTICQA REPORT 2-3 99.11.30 <br />