My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GeoSyntec Consultants 0 <br />• Monitor the Contractor's work schedule and work progress. <br />• Monitor the Contractor's quality control program. <br />Record the Contractor's required certifications. <br />Perform all documentation requirements. <br />• Prepare and certify the Final Closure CQA Report for submission to regulatory <br />officials. <br />3.2 CQA Inspection Personnel <br />CQA inspection personnel will have formal training and practical experience in <br />inspecting and testing construction work, including conducting and recording inspection <br />activities, preparing daily reports, and performing field testing. In addition, knowledge <br />of codes and regulations involving material handling, observation of testing procedure, <br />equipment, and reporting procedures will be required. <br />The CQA personnel will perform various tests and observations during <br />construction such as: <br />• Ensuring that all testing equipment is properly calibrated on a regular basis and <br />that the calibration is documented. <br />Accurately recording all test data and organizing them in a manner that allows <br />easy reference. <br />• Evaluating the Contractor's construction quality control plan to ensure that it <br />meets or exceeds the CQA Plan requirements. <br />Reporting observations and test results as the work progresses. <br />The supporting CQA inspection personnel will work under the supervision and <br />guidance of the CQA Officer. Inspection personnel will perform onsite inspections of <br />the construction and closure and determine whether the work meets the requirements of <br />the Project Plans and Specifications. Field tests and visual observations will be used to <br />J:\ALIED\FORWARD\CLOSUREIREPORIICQA REPORT 3-2 99.11.30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.