My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 GeoSyntec Consultants <br />evaluate construction practices. If CQA personnel observe poor construction practices, <br />the CQA Officer will be notified immediately. The CQA inspection personnel will be <br />responsible for verifying that all testing is conducted in accordance with American <br />Society for Testing Materials (ASTM) standards or other specified test methods and that <br />the proper test equipment is used. The results of all inspections, including work that is <br />unacceptable, will be reported to the CQA Officer. <br />3.3 Contractor <br />The Contractor is responsible for constructing the project in conformance with <br />design plans, specifications, and this CQA Plan. Construction of the components <br />making up the final cover must be performed by the Contractor or appropriately <br />qualified installers subcontracted by the Contractor. The Contractor must allow the <br />CQA Team to access the work and shall assist the CQA Team in performing the <br />required sampling and testing. In addition, the Contractor will provide construction <br />surveys for all layers of the final cover. The Contractor shall provide all necessary <br />equipment required to complete the work in accordance with the Project Plans and <br />Specifications. <br />J:WLLIED\FORWARD\CLOSURE\REPORT)CQA REPORT 3-3 99.11.30 <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.