My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I] <br />C <br />GeoSyntec Consultants <br />• Obtain samples and perform material conformance testing as required by the <br />Project Specifications. <br />• Observe the GDL as it is deployed and record all defects and disposition of the <br />defects. <br />• Monitor that the fabric portion of the panels are sewn together as required by <br />the Project Specifications. <br />• Observe that the GDL is temporarily secured with sand bags. <br />• Confirm that GDL repairs are performed in accordance with the Project <br />Specifications. <br />• Confirm that the GDL is placed with drainage axis parallel to slope gradient <br />and is properly anchored in anchorage trenches as required by the Project Plans <br />and Specifications. <br />• Inspect the GDL installation to ensure that flow from the layer is directed into <br />the surface water drainage system as shown on the Project Plans. <br />5.2.4 Post -Construction Inspection <br />Upon completion of construction, a post -construction inspection will be conducted <br />by the CQA Team to check for material and placement imperfections in the installed <br />materials and identify those areas that require corrective attention by the Contractor. <br />The post -construction inspection, or "final walk through", should include the CQA <br />Team, Owner, and the Contractor. <br />The CQA Team will inspect for the following: <br />• Low spots or depressions that would cause water to pond. <br />• Areas where surface water drainage is not directed as shown on the Project <br />Plans. <br />• Areas that are damaged or improperly compacted. <br />J:WLLIED\FORWARD\CLOSUREUtEPORT\CQA REPORT S -S 99.11.30 <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.