My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GeoSyntec Consultants 0 <br />• Testing the relative compaction and water content of each lift of clay liner <br />material at the frequency shown in Table 3; where field density tests or water <br />contents fail to meet specified values, notify the Contractor to rework the area <br />or remove the failing material. <br />• Observing the type of equipment and number of passes used in compaction and <br />verifying that each lift of earth material has been properly handled and <br />compacted per the Project Specifications. <br />• Identifying any material changes. <br />• Observing the compacted clay for desiccation cracking. <br />• Test the relative compaction of the vegetative layer at the frequency shown in <br />Table 4. <br />• Reviewing the Contractor's construction surveys to check minimum layer <br />thicknesses and drainage grades. <br />• Inspecting pipe trench backfill activities <br />• Testing relative compaction of pipe zone and trench backfill materials per <br />Tables 5 and 6. <br />5.2.3 Geocomposite Drainage Layer <br />The duties of the CQA Team during placement of the geocomposite drainage layer <br />(GDL) are to: <br />• Verify that GDL panels are deployed and joined in accordance with the Project <br />Plans and Specifications. <br />• Confirm that all defect locations have been marked and that the Contractor and <br />the CQA Officer have been informed of any required repairs. <br />• All repairs are completed in accordance with the Project Specifications and <br />recorded on geocomposite drainage layer repair forms. <br />]:\ALLIED\FORWARD\CLOSURE\REPORrCQA REPORT 5-4 99.11.30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.