My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GeoSyntec Consultants I* <br />• Perform soil compliance tests to determine if proposed soils are acceptable for <br />use within the final cover. <br />• Select all soil sampling and testing locations. <br />• Determine the relative compaction and moisture content of the clay liner <br />material and compare with the established relationship between moisture <br />content, dry density, and hydraulic conductivity. <br />• Determine the relative compaction and moisture content of the vegetative layer <br />material. <br />• Request that the Contractor moisture condition and re -compact areas where the <br />field density test results indicate that specified design requirements are not met, <br />and then retest the soil for relative compaction and moisture content. <br />• Coordinate with soils laboratory to have appropriate soil tests performed. All <br />testing shall be performed in accordance with the appropriate testing methods <br />shown in Table 7. <br />• Observe placement of vegetative layer over geocomposite drainage layer. <br />Record any damage to the underlying synthetics resulting from the operation of <br />equipment. <br />• Make periodic inspections of drainage pipe installation procedures. <br />• Verify that Contractor is placing and compacting both the trench and pipe zone <br />backfill as outlined in Tables 5 and 6. <br />6.1.1 Material Acceptance <br />The material acceptance tests for the imported NARCO clay material (if needed for <br />clay admixture) are listed in Table 1. <br />6.1.2 Compliance Tests <br />The minimum required compliance tests for the clay liner, vegetative layer, <br />foundation layer, pipe zone backfill, and trench backfill are listed in Tables 2 through 6. <br />J:\ALLIED\FORWARD\CI.OSURE\REPORT\CQA REPORT 6-2 99.11.30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.