GeoSyntec Consultants I* <br />• Perform soil compliance tests to determine if proposed soils are acceptable for <br />use within the final cover. <br />• Select all soil sampling and testing locations. <br />• Determine the relative compaction and moisture content of the clay liner <br />material and compare with the established relationship between moisture <br />content, dry density, and hydraulic conductivity. <br />• Determine the relative compaction and moisture content of the vegetative layer <br />material. <br />• Request that the Contractor moisture condition and re -compact areas where the <br />field density test results indicate that specified design requirements are not met, <br />and then retest the soil for relative compaction and moisture content. <br />• Coordinate with soils laboratory to have appropriate soil tests performed. All <br />testing shall be performed in accordance with the appropriate testing methods <br />shown in Table 7. <br />• Observe placement of vegetative layer over geocomposite drainage layer. <br />Record any damage to the underlying synthetics resulting from the operation of <br />equipment. <br />• Make periodic inspections of drainage pipe installation procedures. <br />• Verify that Contractor is placing and compacting both the trench and pipe zone <br />backfill as outlined in Tables 5 and 6. <br />6.1.1 Material Acceptance <br />The material acceptance tests for the imported NARCO clay material (if needed for <br />clay admixture) are listed in Table 1. <br />6.1.2 Compliance Tests <br />The minimum required compliance tests for the clay liner, vegetative layer, <br />foundation layer, pipe zone backfill, and trench backfill are listed in Tables 2 through 6. <br />J:\ALLIED\FORWARD\CI.OSURE\REPORT\CQA REPORT 6-2 99.11.30 <br />