07/20/99 Construction Field Report Job No. 986011.0: <br /> DFR No. 53 VECTOR ENGINEERING, INC. Page No. <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 53 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch Stefan,Jr. 7-20-99 Tuesda <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purdy <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Duane Meadows William Geary <br /> Source And Description Of Fill Material: Weather: CQA Technician/Technician: <br /> Clear Warm FRANK DELL-ERA <br /> ANTONIO HENRI UEZ <br /> Equipment used: <br /> Guinn: 140G Grader,3-633/1-623 Paddle Wheels,D4H Cat Dozer,D5H Cat Dozer,320L Cat Excavator,966D Cat loader,Water <br /> Truck,CS 563C Cat Smooth Drum Roller.GSE: 544E John Deere Loader Gradall. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: 7 total GSE Crew: 12 total <br /> Guinn continued to import and grade the GDM utilizing the D4H and the D5M. Guinn continues to place <br /> geotextile and operation layer material over the approved GDM. Guinn placed coarse aggregate and <br /> geotextile to form the drainage burrito over the 6"LCRS pipe running from east to west. Guinn pumped out <br /> the standing water and swept the sump area. Guinn then placed the geotextile pad down and lifted the tank <br /> into place. Guinns water truck got stuck out side of the cell area and unloaded a tank full of water over the <br /> edge of the southern road. <br /> GSE deployed GCL and geomembrane on the southern slope of cell WMU D-99. GSE deployed 19is <br /> of GCL with approximately 16,303.5ft and 12 panels of HST geomembrane with a total of 17,459ft .GSE <br /> deployed geocomposite between the Ashpit and the eastern slope of cell WMU D-99. A total of 15 panels <br /> were placed with approximately 11,069.5ft <br /> Vector Engineering, Inc. CQA observed placement of GDM,geotextile and the operations layer material. <br /> CQA observed GCL and geomembrane deployment,repairs,seaming,overlap and air testing made to the <br /> geomembrane. Observed vacuum testing of repairs made. CQA pulled 3 destructive samples with all <br /> meeting the required specifications. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: <br />