Laserfiche WebLink
07/26/99 Construction Field Report Job No.986011.0: <br /> DFR No. 57 VECTOR ENGINEERING, INC. Page No. <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 57 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Ment CA Butch Stefam,Jr. 7-26-99 Monde <br /> General Contractor. Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purd <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Duane Meadows William Geary <br /> Source And Description Of Fill Material: Weather: CQA Technician/Technician: <br /> Clear Warm FRANK DELL-ERA <br /> Equipment used: <br /> Guinn: 140G Grader,3-633/1-623 Paddle Wheels,D4H Cat Dozer,D5H Cat Dozer,320L Cat Excavator,966D Cat loader,Water <br /> 1%cl CS 563C Cat Smooth Drum Roller.GSE: 544E John Deere Loader,Gradall. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: 7 total <br /> Guinn continues to spread the GDM on the southern and eastern edge of the cell floor. Guinn backfilled and <br /> compacted a portion of the anchor trench on the western edge of the Ashpit. Guinn placed 400' of perforated <br /> 3"pipe and the coarse gravel material in the subdrain on the south slope of the Ashpit. Guinn utilized wheel <br /> barrows to place the gravel in the subdrain. <br /> Vector Engineering,Inc. CQA observed placement and verified thickness on portions of the completed <br /> GDM. CQA observed placement and compaction of subgrade material in the the anchor trenches. <br /> File Name: Forward Landfill Pr aced b : Frank Dell-Era Reviewed by: U <br />