08/04/99 Construction Feld Report Job No. 986011.0: <br /> DFR No. 64 VECTOR ENGINEERING, INC. Page No. l <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 64 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch Stefan,Jr. 8-4-99 Wednesda <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purdy <br /> General Forman Lincr Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Source And Description Of Fill Material: Weather: CQA Technician/Technician: <br /> Clayey sandy silt Clear Warm FRANK DELL-ERA <br /> SCOTT PURDY <br /> Equipment used: <br /> Guinn: 14OG Grader,3.633/1-623 Paddle Wheels,D4H Cat Dozer,D5H Cat Dozer,320L Cat Excavator,966D Cat loader,Water <br /> Truck,CS 5630 Cat Smooth Drum Roller. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: 7 total/Tim Guinn on site. <br /> Guinn continued to excavate and stockpile the wooded debris from the leachate impoundment pond area. <br /> Guinn is stockpiling the material over the clay-mixing pad. Guinn utilized the excavator to remove a 62' <br /> section that contained several roots out of the western slope of the leachate impoundment. Guinn is utilizing <br /> 2-633 scrapers,D5 Cat dozer and the 140G grader to excavate and grade the pond area. The water truck <br /> continues to moisture condition the haul roads and all work areas. Guinn continued to place and compact <br /> general earthfill on the eastern slope termination berm. Guinn excavated the material placed over the <br /> southwestern Asit anchor trench plywood. Guinn pulled the plywood up and placedeotextile material <br /> der it as per the plans and replaced the vegetative cover material. <br /> Vector Engineering,Inc. Tested compaction on the eastern slope termination berm.Observed excavation of <br /> the leachate impoundment pond. Observed excavation of the vegetation layer to place geotextile under the <br /> plywood CQA, Scott Purdy of Vector,Butch from Allied,Tim Guinn and Duane from Guinn Construction <br /> had a meeting on site about the root problem in the eastern slope of the leachate pond. Guinn will over <br /> excavate and replace with clean material. Vent design has been changed. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: U5 <br />