08/06/99 Construction Field Report Job No. 986011.0: <br /> DM No. 66 VECTOR ENGINEERING, INC. Page No. 1 <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 66 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch St Jr. 8-6-99 Friday <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purd <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Source And Description Of Fill Material: Weather: CQA Technician/Technician.- <br /> Clayey <br /> echnician/Technician:Cla sandy silt I Clear Warm FRANK DELL-ERA <br /> Equipment used: <br /> Guinn: 140G Grader,3-633/1-623 Paddle Wheels,D4H Cat Dozer,D513 Cat Dozer,320L Cat Excavator,966D Cat loader,Water <br /> Truck, CS 563C Cat Smooth Drum Roller. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: 7 total <br /> Guinn continued to excavate and stockpile the leachate pond material. Guinn is stockpiling the excavated <br /> material just north of the leachate pond. Guinn is utilizing the 623,D5 Cat dozer and the 140G grader to <br /> excavate and grade the pond area. Guinn is cutting the I%flow towards the sump. Guinn completed the <br /> placement of the protective cover on the cell floor. The water truck continues to moisture condition the haul <br /> roads and all work areas. Guinn placed earthfill material along the eastern slope termination point to <br /> construct the berm. Guinn started to place the berm material on the 2°d bench above the cell floor on the <br /> eastern slope. <br /> Vector Engineering,Inc. Observed grading and excavation of the leachate impoundment pond- <br /> File <br /> ondFile Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: V5 <br />