8/23/99 Construction Field Report Job No. 986011.0: <br /> DFR No. 77 VECTOR ENGINEERING, INC. Page No. 1 <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 77 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch St Jr. 8-23-99 Monday <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purdy <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Robert Burns Bill Geary <br /> Source And Description Of Fill Material: Weather: CQA Technician: <br /> C!yq sandy silt Clear Hot FRANK DELL-ERA <br /> Equipment used: <br /> Guinn: 140G Grader,3-633/1-623 Paddle Wheels,D4H Cat Dozer,320L Cat Excavator,966D Cat loader,Water Truck, <br /> GSE: Gra John Deere 544 Loader. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: 5 total GSE Crew: 8 total <br /> Guinn continued to place the first lift of earthfill in the anchor trench around the Leachate impoundment <br /> pond. Guinn dressed up the Ashpit by track walking the slopes. Guinn placed the cement slurry mix in the <br /> sump riser anchor trench and the anchor trench in the southwest corner of cell VttMU D-99. The water truck <br /> continues to moisture condition all over the site. <br /> GSE deployed geonet on the floor,north and south slopes of the leachate impoundment pond. GSE deployed <br /> approximately 45,000fe. All seams were tied with approved plastic ties. <br /> Vector Engineering,Inc. Observed placement,overlap, seaming of the Geonet. CQA observed backfilling of <br /> the anchor trench and placement of the cement slurry mix in the anchor trench and the sump riser trench. <br /> File Name:Forward Landfill Prepared b : Frank Dell-Era Reviewed by: VS <br />