8/20/99 Construction Field Report Job No.986011.0,' <br /> DFR No. 76 VECTOR ENGINEERING, INC. Page No. 1 <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 76 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch Stefan,Jr. 8-20-99 Frida <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purdy <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Robert Burns Dave Tuttle <br /> Source And Description Of Fill Material: Weather: CQA Technician/Technician: <br /> Clayey sandy silt Clear Warm FRANK DELL-ERA <br /> CHRIS KING <br /> Equipment used: <br /> Guinn: 140G Grader,3-633/1-623 Paddle Wheels,D4H Cat Dozer,320L Cat Excavator,966D Cat loader,Water Truck,CS 563C <br /> Cat Smooth Drum Roller Volvo A25B Rock Truck. GSE:Gradall John Deere 544 Loader. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: 7 total GSE Crew: 12 total <br /> Guinn continued to place the first lift of earthfill in the anchor trench around the Leachate impoundment <br /> pond in areas approved by CQA. Guinn utilized the excavator to complete the anchor trench around the <br /> leachate impoundment pond. Guinn compacted below the southern roadway with the excavator. Guinn <br /> grader hit the geomembrane while cutting the 2%grade on the I"bench above cell WMU D-99. All <br /> materials were damaged and will need to be repaired. The water truck continues to moisture condition all <br /> over the site. <br /> GSE completed deployment of the secondary liner system in the leachate impoundment pond. GSE deployed <br /> a total of 16 panels of 60 mit smooth geomembrane totaling approximately 15,155fe. GSE completed <br /> repairs,vacuum tests and airtesting of all seams. <br /> Vector Engineering,Inc. Observed placement and logged GCL and Liner panels,overlap, seaming, and <br /> repairs. CQA observed backfilling of the anchor trench. CQA informed Allied and GSE that there was a <br /> repair needed on cell WMU D-99. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: <br />