8/25/99 Construction Field Report Job No. 986011.0 <br /> DFR No. 79 VECTOR ENGINEERING, INC. Page No. 1 <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 79 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch Ste&n' Jr. 8-25-99 Wednesday <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purl <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Robert Burns Bill Geary <br /> Source And Description Of Fill Material: Weather: CQA Technician: <br /> Clayey sandy silt Clear Hot FRANK DELL-ERA <br /> Equipment used: <br /> Guinn: 140G Grader,3.633/1-623 Paddle Wheels,D4H Cat Dozer, 320L Cat Excavator,966D Cat loader,Water Truck, Volvo <br /> A25B Rock Truck.GSE: Gradall,John Deere 544 Loader. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: 5 total GSE Crew: 8 total <br /> Guinn backfilled and compacted the earthfill around the sump tank in cell WMU D-98.Guinn backfilled the <br /> anchor trenches on the southern and western slopes of the leachate impoundment pond. <br /> GSE deployed a total of 37 panels of 60mil geomembrane for the primary liner system in the leachate <br /> impoundment pond. 27 panels were smooth and 10 panels were smooth white with black textured on the <br /> bottom totaling approximately 29,417ft2. No repairs were made today. All seams were welded and airtested. <br /> Vector Engineering, Inc. Observed placement and logged geomembrane panels,overlap, seaming,and <br /> repairs. CQA pulled 3 destructs with all passing the required specifications. CQA tested compaction on the <br /> earthfill on the sump tank in cell WMU D-98 with all tests passing. <br /> [File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: u� <br />