My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/26/99 Construction Fier Report Job No. 986011.0; <br /> DFR No. 80 VECTOR ENGINEERING, INC. Page No. l <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 80 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch Stefan Jr. 8-26-99 1ThursdR <br /> General Contractor: Liner Contractor. Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purdy <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Robert Burns Bill Geary <br /> Source And Description Of Fill Material: Weather: CQA Technician: <br /> Clayey sandy silt �Cloudy,MyM FRANK DELL-ERA <br /> Equipment used: <br /> Guinn: 140G Grader,633/1-623 Paddle Wheels,D4H Cat Dozer, 320L Cat Excavator,966D Cat loader,Water Truck, <br /> GSE:Gradall,John Deere 544 Loader. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: 5 total GSE Crew: 8 total <br /> Guinn backfilled and compacted the earthfill on the western slope of the leachate impoundment pond. Guinn <br /> installed the brackets for the force main header pipe and the sump riser support. Guinn set the brackets in <br /> concrete. <br /> GSE deployed a total of 26 panels of 60mi1 geomembrane for the primary liner system in the leachate <br /> impoundment pond totaling approximately 23,967.5fe. GSE flipped the smooth/textured geomembrane over <br /> with the textured side up so the warranty would not be voided(PER Bill Geary). GSE started to make repairs <br /> today after all seams were aieste . <br /> Vector Engineering,Inc. Observed placement and logged geomembrane panels,overlap, seaming, d <br /> repairs. CQA pulled 4 destructs with DS-5p failing. CQA informed GSE who cut DS—5p A and DS-5p B <br /> with failing results. GSE will cap strip the seam in Question. Seam 54/57 was the first of the day for IG 2040 <br /> so CQA and GSE pulled sample DS-6p from the second seam welded by IG 2040 with passing results. GSE <br /> will isolate the prior days seams and test. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: j <br />
The URL can be used to link to this page
Your browser does not support the video tag.