8/28/99 Construction Field Report Job No.986011.02 <br /> DFR No. 82 VECTOR ENGINEERING, INC• Page No. l <br /> oject Name: Client Or Owner: Daily Field Report Sequence <br /> Forward Landfill Allied Waste No.: <br /> 82 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch Stefani,Jr. 8-28-99 Saturday <br /> General Contractor: Liner Contractor: Proj. Reviewed By: <br /> Guinn Construction GSE Engineer: <br /> Scott Purdy <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Robert Burns Bill Geary <br /> Source And Description Of Fill Material: Weather: CQA Technician: <br /> Clayey sandy silt Clear Hot FRANK DELL-ERA <br /> Equipment used: <br /> Guinn: 140G Grader,3-633/1-623 Paddle Wheels,D4H Cat Dozer,320L Cat Excavator,966D Cat loader,Water Truck,Volvo <br /> A25B Rock Truck.GSE:Gradall,John Deere 544 Loader. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew:Not on site GSE Crew: 8 total <br /> GSE completed airtesting all seams performed and continued to make repairs to the geomembrane. GSE installed <br /> the boots for the force main drop inlet brackets. GSE started the boots for the lyisometers. GSE vacuum tested the <br /> repairs made to the geomembrane. GSE installed wind vents on the western slope approximately V off of the hinge <br /> point at approximately 50' intervals. <br /> Vector Engineering,Inc. Observed welding of boots, repairs, vacuum testing, air vent installation in the leachate <br /> Adft <br /> poundent pond. <br /> LFileame: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: U <br />