Laserfiche WebLink
8/27/99 Construction Field Report Job No. 986011.0 <br /> DFR No. 81 VECTOR ENGINEERING,E G, INC. Page No. l <br /> Project Name: Client Or Owner: Daily Field Report Sequence <br /> Forward Landfill Allied Waste No.: <br /> 81 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch Stefani,Jr. 8-27-99 Friday <br /> General Contractor: Liner Contractor: Proj. Reviewed By: <br /> Guinn Construction GSE Engineer: <br /> Scott Purdy <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Robert Burns Bill Geary <br /> Source And Description Of Fill Material: Weather: CQA Technician: <br /> Clayey sandy silt Clear Hot FRANK DELL-ERA <br /> Equipment used: <br /> Guinn: 140G Grader,3-633/1-623 Paddle Wheels,D4H Cat Dozer,320L Cat Excavator,966D Cat loader,Water Truck,Volvo <br /> A25B Rock Truck.GSE: Gradall,John Deere 544 Loader. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: Not on site GSE Crew: 8 total <br /> GSE airtested all seams performed today and continued to make repairs to the geomembrane. GSE tested <br /> DS-6p taken from the seam that machine 2040 welded after the failed DS-5p and passed peel and shear <br /> testing. GSE cap stripped all of the seams performed by machine 2040 prior to DS-5p on 6-26-99 due to <br /> samples taken from the seams failed testing. Seams tested after DS-6p passed testing. <br /> Vector Engineering, Inc. Observed and logged seaming, airtesting and repairs made to the geomembrane. <br /> CQA pulled 2 destructs both with passing results. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: f <br />