My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5-10-99 Weekly Field Report Job No. 986011.0,' <br /> WFR No. 1 VECTOR ENGINEERING, INC. Page No. 1 LL <br /> I <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Land Fill Allieed Waste 1 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch Stefani,Jr 5-10 TO 5-16-99 Mon—Sun <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Constnrction GSE Scott Puryr <br /> General Forman Grading Contractor Superintendent Or Foreman: <br /> Duane <br /> Source And Description Of Fill Material: Weather: CQA Technician: <br /> Clear FRANK DELI-ERA <br /> Equipment used: <br /> Guinn: 140G Grader,2-633 Paddle Wheels,D6R Cat Dozer,320L Cat Excavator,966D Cat loader,Water Truck.Allied:2-300E <br /> Cat Rock Trucks,325 Cat Excavator,D8,D4, 140G Grader, Smooth Drum Roller. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Monday May 10, 1999 <br /> Allied—utilized 2 rock trucks loaded from the stockpile with a 325 excavator to haul subgrade material to the eastem <br /> slope of cell WMU-99 where a D4 and D8 spread and compacted the material on the steeper slopes. Allied <br /> utilized a smooth drum roller to compact the subgrade on the slopes that were accessible.Allied utilized a wager <br /> truck to maintain moisture in the subgrade material. <br /> Guinn—Not on site today. <br /> Tuesday May 11, 1999 <br /> Allied—Utilized 2 rock trucks loaded from the stockpile with a 325 excavator to haul subgrade material to the eastern <br /> slope of cell WMU-99 where a D4 and D8 spread and compacted the material on the steeper slopes. Allied <br /> utilized a water truck to maintain moisture conditioning of the subgrade material. <br /> —Tim Guinn and Duane Meadows were on site with their surveyors from Dewalt Surveying in Bakersfield. <br /> Dewalt set up some control points for complete coverage of the site. Dewalt started the topo of the WMU F <br /> North Leachate pond and 50' on each side of the liner tie in. It was found that Point#103 was off.5 in elevation. <br /> Wednesday May 12, 1999 <br /> Allied—Utilized 2 rock trucks loaded from the stockpile with a 325 excavator to haul subgrade material to the eastern <br /> slope of cell WMU-99 where the D8 spread and compacted the material on the steeper slopes. Allied utilized a <br /> water truck to maintain moisture conditioning of the subgrade material. <br /> Guinn—Started excavation of the liner tie in with a 320L excavator and 3 laborers hand shoveling soil off the plywood <br /> placed on the edge of the liner. Guinn hit and tore the liner a couple times while excavating. Dewalt completed <br /> the topo of the WMU F North Class H leachate pond. Dewalt reset point#103 to documented elevation. <br /> Thursday May 13, 1999 <br /> Allied—Utilized the D4 to trim the subgrade material on the eastern slope. Allied had the smooth drum roller compact <br /> the eastern slope by backing down the slope. <br /> Guinn—Guinn continues to expose the liner tie in on the south side of cell WMU-98. Guinn established a haul road off <br /> of the eastern end of cell WMU-99. Guinn started to prepare the mixing pad area utilizing the laser to check <br /> grade for low areas.Guinn cleared and grubbed the clay stockpile area.Dewalt set Cut/Fill stakes on the southern <br /> side of cell WMU-99. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: <br />
The URL can be used to link to this page
Your browser does not support the video tag.